Charging the System
The AFX Series Water/Glycol and the integral
mounted Air-cooled systems are factory charged
with refrigerant. All other direct expansion
systems must have the piping evacuated and
the system charged.
All refrigerant connections should be leak tested
before the system is charged with refrigerant.
The complete system should be pressured to
400 psig with refrigerant and dry nitrogen. Use
an electronic leak detector to carefully check
each joint. Leaks should be repaired and the
system pressurized again to 400 psig to double
check all joints.
After the leak check has been performed, a
vacuum pump should be used to evacuate the
total system (the unit, condenser and inter-
connecting piping) after the condenser has been
installed in the system. Put vacuum on the total
system of 29 inches or 50 microhms and hold it
for four hours. Then break the vacuum with dry
refrigerant. At this point the system can be fully
charged.
Follow standard HVAC charging practices but
use the following recommendations: when the
system is properly charged, the superheat
should be nominally 15
o
F and the subcooling
10
o
F.
System Function
After connecting all the utilities to the unit and
ensuring that the unit is securely mounted in
place, start the air conditioner by enabling the
ON/OFF switch on the thermostat in the ON
position. This will start the evaporator blower.
Turn the thermostat to the lowest setting and the
compressor will start. After the refrigeration
system has functioned for approximately 15
minutes, observe the suction and discharge
pressure gauges and inspect
the sight glass. The system should be fully
charged (sight glass clear). The gauges should
indicate between 58-75 psig suction pressure
and approximately 225-275 psig discharge
pressure. If the unit is functioning properly, the
controls may be set at the desired setting and
the return air grille closed.
Complete the start-up sheet and return it to
APC.