Installation
Computer Room Preparation
During the design of the computer room,
consideration should be given to the following
factors: ease of entry, floor loading factors and
accessibility of piping and wiring.
The room must be sealed with a vapor barrier to
minimize moisture infiltration. Polyethylene film
(plastic sheeting) is a good vapor barrier for
ceiling and wall applications. Rubber or plastic-
based paints should be applied to concrete
floors and walls.
The room should be thoroughly insulated to
minimize thermal loads and make-up air should
be kept to a minimum to reduce additional
temperature, filtration and moisture loads.
A computer room using a raised floor plenum for
air distribution should have at least 12 inches of
clear space between the false floor and sub-floor
for air conditioners below 15 ton capacities. Pay
special attention to the location of pipe chases,
electrical conduits and other underfloor
obstructions. These objects can block air
circulation and increase air pressure drops thus
reducing system efficiency and causing possible
hot spots in your data processing room.
Minimum clear space for larger rooms should be
18 inches when air conditioners of 15 tons
capacity and larger are utilized.
Unit Location
Unit location is important for efficient and even
environmental control in your data center. The
air conditioners should be located as close to
the largest heat load as possible. Units should
be mounted along the longest walls (in rooms
having a high aspect ratio) to ensure even air
distribution. Erratic control or mechanical failure
can and will result if the unit does not obtain
proper air volume and distribution due to
improper installation
Service Access
At least 30 inches of clear space must be left in
front of the AFX Series unit and at least 24
inches on each side for access through the
panels and to facilitate service.
Receiving the Unit
Your AFX unit has been completely tested and
inspected prior to shipment from APC. To
ensure that you have received the unit in
excellent condition, perform a careful inspection
of the crating and the unit immediately upon
receipt. Verify that all parts ordered were
received as specified and that the unit is the
correct size and voltage necessary to fulfill your
environmental control needs. Report any
apparent or concealed damage discovered to
the freight carrier for insurance purposes. If
necessary, contact APC’s technical service
department for aid in repairing or replacing
damaged parts. While APC is not responsible for
exterior or interior damages incurred in transit,
we want to make sure that you have no undue
delays in your system start-up.
Rigging
The AFX air conditioner is manufactured with a
formed steel frame for maximum strength and
unit integrity. However, as with all
electrical/mechanical equipment, care must be
taken in proper rigging of your AFX unit. If you
uncrate the unit before moving it into place, we
suggest that the panels be removed to prevent
damage during handling.
When using a forklift to move the AFX unit, use
the shipping skid to protect the bottom of the
unit. When using chains, cable or rope to lift the
unit, use spreader bars to prevent damage to
the finished panels.
Every unit has sockets in the bottom corners
sized to accept casters with 7/8” stems (casters
are available from the factory, if desired).
Casters allow the unit to move through halls and
rooms where forklifts are not practical.
Unit Installation
DOWNFLOW DISCHARGE
If your data center has been designed to
incorporate a raised floor, the space between
the raised floor and subfloor may be used as an
air distribution plenum or a chase where ducting
to discharge grilles may be installed. Downflow
discharge units may be installed directly on the
raised floor after ensuring the floor loading
factory is satisfactory to support the unit.