Installation and Start-UpInfraStruXure®For Medium Data Centers40 kW 208/480/600 V
InfraStruXure System - Installation and Start-Up 7Installation ProceduresInstallation Procedure OverviewThis section provides the basic steps to insta
Installation Procedures: Installation Procedure Overview8 InfraStruXure System - Installation and Start-Up6. Connect utility conductors to the PDU.For
Installation Procedures: Installation Procedure OverviewInfraStruXure System - Installation and Start-Up 916. Configure the InfraStruXure Manager. For
10 InfraStruXure System - Installation and Start-UpLevel the PDU, UPS, NetShelter, and XR Battery EnclosuresLeveling feet are attached under the enclo
InfraStruXure System - Installation and Start-Up 11Exchange Side PanelsBefore installing the InfraStruXure PDU, Symmetra PX UPS, and XR Battery Enclos
Installation Procedures: Exchange Side Panels12 InfraStruXure System - Installation and Start-Up3. Remove the side panels from the sides of the PDU an
InfraStruXure System - Installation and Start-Up 13Join the PDU, UPS, and XR Battery Enclosures1. Move the PDU, Symmetra PX UPS, and XR Battery Enclos
14 InfraStruXure System - Installation and Start-UpConnect Utility Conductors to the PDUElectrical Hazard: A licensed electrician must connect input c
Installation Procedures: Connect Utility Conductors to the PDUInfraStruXure System - Installation and Start-Up 15For overhead wiring: Remove the user
InfraStruXure System - Installation and Start-UpAbout this ManualThis manual covers basic installation and start-up procedures for certified electrici
Installation Procedures: Connect Utility Conductors to the PDU16 InfraStruXure System - Installation and Start-UpRoute the input conductors to the Mai
Installation Procedures: Connect Utility Conductors to the PDUInfraStruXure System - Installation and Start-Up 17At the Main Input switch, connect the
18 InfraStruXure System - Installation and Start-UpConnect AC Power and Control WiringElectrical Hazard: Only Field Service Engineers or qualified per
Installation Procedures: Connect AC Power and Control WiringInfraStruXure System - Installation and Start-Up 19Connect control wiring. 1. Connect the
20 InfraStruXure System - Installation and Start-UpConnect DC Power Wiring, if ApplicableElectrical Hazard: Only Field Service Engineers or qualified
Installation Procedures: Connect DC Power Wiring, if ApplicableInfraStruXure System - Installation and Start-Up 21Connect power cables from the XR Bat
22 InfraStruXure System - Installation and Start-UpConnect an Emergency Power Off SwitchOverviewTo provide a mechanism for emergency power off, attach
Installation Procedures: Connect an Emergency Power Off SwitchInfraStruXure System - Installation and Start-Up 23Connect an EPO switch to the user con
24 InfraStruXure System - Installation and Start-UpConnect User Input Contacts and Relay Outputs to the User Connection Plate Overview Make contact cl
InfraStruXure System - Installation and Start-Up 25Route and Attach Power Cables to the RacksOverhead WiringRoute and attach power cables to equipment
ContentsInfraStruXure System - Installation and Start-Up iSafety...1IMPOR
Installation Procedures: Route and Attach Power Cables to the Racks26 InfraStruXure System - Installation and Start-Up– For single-feed devices within
Installation Procedures: Route and Attach Power Cables to the RacksInfraStruXure System - Installation and Start-Up 27application) from the enclosure
28 InfraStruXure System - Installation and Start-UpRoute Data Cables to the InfraStruXure Manager Hub (or Switch)1. Connect a CAT-5 network cable (pro
InfraStruXure System - Installation and Start-Up 29Start-Up ProcedureApply power to the systemSafety warningsThis section provides instructions on how
30 InfraStruXure System - Installation and Start-Up6. Install at least one battery module (four battery units) in the Symmetra PX UPS. Install battery
Start-Up Procedure: Apply power to the systemInfraStruXure System - Installation and Start-Up 318. Secure the power module:a. Tighten the screws on ea
Start-Up Procedure: Apply power to the system32 InfraStruXure System - Installation and Start-UpVerify UPS battery operation1. Read the messages displ
Start-Up Procedure: Apply power to the systemInfraStruXure System - Installation and Start-Up 333. Command the UPS to turn off power to the load: a. P
Start-Up Procedure: Apply power to the system34 InfraStruXure System - Installation and Start-UpVerify proper voltage and phase rotation at the UPS1.
Start-Up Procedure: Apply power to the systemInfraStruXure System - Installation and Start-Up 355. Close (turn ON) the Q2 circuit breaker on the PDU.3
ii InfraStruXure System - Installation and Start-UpConnect DC Power Wiring, if Applicable . . . . . . . . . . . . . . . . . . . . . 20Cascade XR Batte
Start-Up Procedure: Apply power to the system36 InfraStruXure System - Installation and Start-UpVerify bypass operationNote: The H3 LED above the Q3 c
Start-Up Procedure: Apply power to the systemInfraStruXure System - Installation and Start-Up 373. Close (turn ON) the Q3 circuit breaker on the Infra
Start-Up Procedure: Apply power to the system38 InfraStruXure System - Installation and Start-Up6. Close (turn ON) the Q2 circuit breaker on the Infra
Start-Up Procedure: Apply power to the systemInfraStruXure System - Installation and Start-Up 392. Close (turn ON) the PDU distribution panel breakers
InfraStruXure System - Installation and Start-Up 41Specifications40 kW InfraStruXure PDUElectrical PD40F6FK1-M PD40G6FK1-M PD40L6FK1-MInput Nominal Vo
Specifications: 40 kW InfraStruXure PDU42 InfraStruXure System - Installation and Start-UpPower Cable Lengths variousRecommended Wire Sizing‡L1, L2, L
Specifications: 40 kW InfraStruXure PDUInfraStruXure System - Installation and Start-Up 43.Configuration Delta to WYEMaximum Power Rating 60kVAMaximum
03/2008990-1483C*990-1483C*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the fo
InfraStruXure System - Installation and Start-Up 1SafetyIMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONSThis manual contains important instruct
2 InfraStruXure System - Installation and Start-UpWarningsInstallation/MaintenanceOnly a certified electrician can perform these tasks: • Connect the
Safety: WarningsInfraStruXure System - Installation and Start-Up 3Total Power OffSet the UPS DC Disconnect circuit breaker and System Enable switch t
Safety: Warnings4 InfraStruXure System - Installation and Start-UpDANGER—Risk of Electric Shock!Electrical Hazard: Hazardous, live parts inside the Sy
InfraStruXure System - Installation and Start-Up 5Site PlanningSpace ConsiderationsUse the figure below to determine the space requirements for instal