APC SYMMETRA PDUM160H-B Specifications

Browse online or download Specifications for Power supply units APC SYMMETRA PDUM160H-B. APC SYMMETRA PDUM160H-B Specifications User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Installation

InstallationSY160K160HPDUM160H-BSYCFXR9Symmetra® PX UPS,Power Distribution Unit, andXR Battery Enclosure160 kW 400 V

Page 2

6 Symmetra PX 160 kW 400 V Installation 990-3017A-001How to Prepare the UPS for Cables when the PDU-XR is placed to the left of the UPSIf the PDU-XR i

Page 3 - Contents

990-3017A-001 Symmetra PX 160 kW 400 V Installation 7Communication CablesCommunication Cables in Installations with PDU-XRMove the enclosures together

Page 4

Communication Cables: Communication Cables in Installations with PDU-XR8 Symmetra PX 160 kW 400 V Installation 990-3017A-001Route the communication c

Page 5 - - SAVE THESE INSTRUCTIONS

990-3017A-001 Symmetra PX 160 kW 400 V Installation 9Communication Cables in Installations without PDU-XRMove the enclosures together so that the comm

Page 6 - Installation Procedure

Communication Cables: Communication Cables in Installations without PDU-XR10 Symmetra PX 160 kW 400 V Installation 990-3017A-001Route the communicati

Page 7 - Installations without PDU-XR

Communication Cables: Communication Cables in Installations without PDU-XR990-3017A-001 Symmetra PX 160 kW 400 V Installation 11Maintenance Bypass Pan

Page 8 - Mechanical Assembly

12 Symmetra PX 160 kW 400 V Installation 990-3017A-001Network Communication CableThe network communication cable (provided) is located on the top of t

Page 9

990-3017A-001 Symmetra PX 160 kW 400 V Installation 13Emergency Power Off SwitchHow to connect the Emergency Power Off (EPO) switchThe UPS must be con

Page 10 - Cable relief

Communication Cables: Emergency Power Off Switch14 Symmetra PX 160 kW 400 V Installation 990-3017A-001EPO switch wiring diagram EPO Wiring OptionsXR

Page 11 - Communication Cables

990-3017A-001 Symmetra PX 160 kW 400 V Installation 15Bonding WireHow to Connect the Bonding WireNote: It might be necessary to move some of the bondi

Page 13

16 Symmetra PX 160 kW 400 V Installation 990-3017A-001Battery CablesHow to Install the APC Battery SolutionThe Symmetra PX 160 kW UPS can monitor up t

Page 14

Battery Cables: How to Install the APC Battery Solution990-3017A-001 Symmetra PX 160 kW 400 V Installation 17Mount the BAT+, BAT-, and CT (midpoint)

Page 15

Battery Cables: How to Install the APC Battery Solution18 Symmetra PX 160 kW 400 V Installation 990-3017A-001How to connect the battery cables in the

Page 16 - Network Communication Cable

990-3017A-001 Symmetra PX 160 kW 400 V Installation 19Power CablesHow to Connect Cables between the UPS and the PDU-XRAPC recommends installing a 45º

Page 17 - Emergency Power Off Switch

Power Cables: How to Connect Cables between the UPS and the PDU-XR20 Symmetra PX 160 kW 400 V Installation 990-3017A-001Before running the cables, lo

Page 18 - EPO switch wiring diagram

990-3017A-001 Symmetra PX 160 kW 400 V Installation 21How to Interconnect and Level the EnclosuresWarning: The system must be installed on a level flo

Page 19 - Bonding Wire

Power Cables: How to Interconnect and Level the Enclosures22 Symmetra PX 160 kW 400 V Installation 990-3017A-001Use a screw driver to lower the level

Page 20 - Battery Cables

Power Cables: PDU-XR Input and Output Cables990-3017A-001 Symmetra PX 160 kW 400 V Installation 23PDU-XR Input and Output CablesHow to get access to t

Page 21

Power Cables: PDU-XR Input and Output Cables24 Symmetra PX 160 kW 400 V Installation 990-3017A-001How to prepare for cablesTop cable entry without or

Page 22 - Top or bottom entry

Power Cables: PDU-XR Input and Output Cables990-3017A-001 Symmetra PX 160 kW 400 V Installation 25How to connect the cables in the PDU-XRCaution: Ensu

Page 23 - Power Cables

ContentsSymmetra PX 160 kW 400 V Installation iSafety...1IMPORTANT SAFETY

Page 24

Power Cables: PDU-XR Input and Output Cables26 Symmetra PX 160 kW 400 V Installation 990-3017A-001Dual mains top or bottom entry. Remove the three bu

Page 25

Power Cables: PDU-XR Input and Output Cables990-3017A-001 Symmetra PX 160 kW 400 V Installation 27Front of the PDU-XRL1NeutralMainsBypassL1L2L3Neutral

Page 26

28 Symmetra PX 160 kW 400 V Installation 990-3017A-001How to connect the subfeed breakersEach subfeed breaker is rated for a maximum of 160 A.Re-inst

Page 27 - Front of the PDU-XR

Power Cables: PDU-XR Input and Output Cables990-3017A-001 Symmetra PX 160 kW 400 V Installation 29How to install the power distribution moduleRemove

Page 28 - How to prepare for cables

Power Cables: UPS Input and Output Cables in Installations without PDU-XR30 Symmetra PX 160 kW 400 V Installation 990-3017A-001UPS Input and Output Ca

Page 29 - Single mains installation

Power Cables: UPS Input and Output Cables in Installations without PDU-XR990-3017A-001 Symmetra PX 160 kW 400 V Installation 31Bottom cable entry in b

Page 30 - Remove the three busbars

Power Cables: UPS Input and Output Cables in Installations without PDU-XR32 Symmetra PX 160 kW 400 V Installation 990-3017A-001Dual mains installation

Page 31

Power Cables: UPS Input and Output Cables in Installations without PDU-XR990-3017A-001 Symmetra PX 160 kW 400 V Installation 33Single mains installati

Page 32 - (cables are not supplied)

34 Symmetra PX 160 kW 400 V Installation 990-3017A-001SpecificationsSymmetra PX UPSCaution: All electrical power and power control wiring must be inst

Page 33 - Remove the left top plate

Specifications: Symmetra PX UPS990-3017A-001 Symmetra PX 160 kW 400 V Installation 35Required upstream current protection (single mains configurations

Page 34

ii Symmetra PX 160 kW 400 V InstallationBattery Cables ... 16How to Install the APC Batter

Page 35

36 Symmetra PX 160 kW 400 V Installation 990-3017A-001Post-Installation ChecklistIf XR Battery Enclosure are installed make sure that all DC breakers

Page 39

10/2007990-3017A-001*990-3017A-001*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any o

Page 40 - Post-Installation Checklist

990-3017A-001 Symmetra PX 160 kW 400 V Installation 1SafetyIMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONSWarning:• ALL safety instructions in

Page 41

2 Symmetra PX 160 kW 400 V Installation 990-3017A-001Installation ProcedureInstallations with PDU-XRStep Description Page NumberMechanical assembly 4

Page 42

990-3017A-001 Symmetra PX 160 kW 400 V Installation 3Installations without PDU-XRStep Description Page NumberMechanical assembly 4Connect the commun

Page 43

4 Symmetra PX 160 kW 400 V Installation 990-3017A-001Mechanical AssemblyHow to Re-Arrange the Side PanelsNote: The type of installation determines the

Page 44 - *990-3017A-001*

Mechanical Assembly: How to Re-Arrange the Side Panels990-3017A-001 Symmetra PX 160 kW 400 V Installation 5Installation without PDU-XR and detached UP