APC AR204A User Manual

Browse online or download User Manual for Rack accessories APC AR204A. Four-Post Rack Unpacking, Installation, and [en]

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Unpacking, Installation

Unpacking, Installation,and CustomizationNetShelter®Four-Post RackAR203AAR204A

Page 2

NetShelter Four-Post Rack—Installation64. Ensure that the U-spacing label is facing the same direction on both the left and right vertical frame posts

Page 3 - Contents

7NetShelter Four-Post Rack—InstallationWarning: Stabilize the rack by securing it to the floor before installing the components—failure to do so could

Page 4

NetShelter Four-Post Rack—Installation8Join the Four-Post RacksJoin the racks directly with no spacing between them using the available holes on the v

Page 5 - Product Overview

9NetShelter Four-Post Rack—InstallationInstall EquipmentThis section provides information on how to install rack-mount equipment in the NetShelter Fou

Page 6 - Product Inventory

NetShelter Four-Post Rack—Installation10Grounding locationsEach rack should be grounded directly to the building ground using one of the grounding nut

Page 7 - Before Installation

11NetShelter Four-Post Rack—InstallationCable ManagementCable management optionsProduct SKU Description Figure19-inch horizontal cable organizersAR860

Page 8 - Inventory

NetShelter Four-Post Rack—Installation12Toolless Hook-and-Loop Cable Managers AR8621A toolless mount hook-and-loop cable fastener for organizing data

Page 9 - Install the Four-Post Rack

13NetShelter Four-Post Rack—InstallationSpacer Bracket 2-in wide for Four-Post Racks AR8652Spacer brackets mount to the sides, front, and rear of open

Page 10

NetShelter Four-Post Rack—Installation14Specifications600-mm Four-Post Rack† One U = 44.4 mm (1.75 in)ItemMeasurementsDimensions AR203A and AR204ARack

Page 11

15NetShelter Four-Post Rack—InstallationFive-Year Factory WarrantyThe limited warranty provided by APC in this Statement of Limited Factory Warranty a

Page 12 - Join the Four-Post Racks

This manual is available in English on the APC Web site (www.apc.com).Dieses Handbuch ist in Deutsch auf der APC Webseite (www.apc.com) verfügbar.Este

Page 13 - Install Equipment

NetShelter Four-Post Rack—Installation16IN NO EVENT SHALL APC, ITS OFFICERS, DIRECTORS, AFFILIATES OR EMPLOYEES BE LIABLE FOR ANY FORM OF INDIRECT, SP

Page 17

03/2010990-3298B-001APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the following

Page 18 - Specifications

ContentsNetShelter Four-Post Rack—InstallationiProduct Overview... 1Description . . . . . .

Page 19 - Five-Year Factory Warranty

NetShelter Four-Post Rack—InstallationiiFive-Year Factory Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Terms of warranty

Page 20 - Warranty claims

1NetShelter Four-Post Rack—InstallationProduct OverviewDescriptionThe American Power Conversion (APC®) NetShelter® Four-Post Rack is a high-quality ra

Page 21

NetShelter Four-Post Rack—Installation2Product InventoryComponents of the Four-Post RackHorizontal frame brackets (600-mm) (4)Equipment mounting hol

Page 22

3NetShelter Four-Post Rack—InstallationBefore InstallationToolsTools (provided)Other tools required (not provided)HardwareHardware (provided)† This it

Page 23

NetShelter Four-Post Rack—Installation4Warning: Read all instructions thoroughly. Warning symbols indicate important instructions that must be followe

Page 24 - 03/2010990-3298B-001

5NetShelter Four-Post Rack—InstallationInstall the Four-Post RackAssemble the rackNote: Fasten the M8 x 16-mm hex-head screws loosely during assembly

Comments to this Manuals

No comments