APC AR8001 Datasheet

Browse online or download Datasheet for Rack accessories APC AR8001. APC HP Mounting Rails - 1 set User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 11
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
NetShelter
Mounting Rail Kit for HP Shelving –
AR8001
990-5016A Rev. 3 6/00
Overview
The Mounting Rail Kit for HP Shelving (AR8001) allows you to install into an American Power Conver-
sion (APC™) NetShelter™ the Hewlett-Packard (HP) NetServer Rack Mount Kits listed in Table 1 below.
There are four sets of instructions in this document. Refer to Table 1 to determine which set of instructions
to use for the HP kit you are installing.
Inventory
Table 2 shows the parts that are included in the Mounting Rail Kit for HP Shelving (AR8001). Some of the
parts used in the installation are supplied with the HP kits.
Table 1: HP NetServer Rack Mount Kits
If you are using
HP NetServer…
…useHP
NetServer Rack
Mount Kit model…
…and refer
to Section…
LM, LS, LF, LH J1451A/B 2
LC J1452A/B 2
LX Pro, LXe J1455A 3
LCII J1456A 1
LHII, LH Pro, LD Pro J1491A 2
E Series J1496A 1
LXr Pro Kit included with
server
4
Table 2: Inventory of APC Mounting Rail Kit for HP Shelving (AR8001)
Item Quantity Figure
Mounting Rail 2
Nut, Caged, M6 3
Page view 0
1 2 3 4 5 6 ... 10 11

Summary of Contents

Page 1 - NetShelter

NetShelter™Mounting Rail Kit for HP Shelving –AR8001990-5016A Rev. 3 6/00OverviewThe Mounting Rail Kit for HP Shelving (AR8001) allows you to install

Page 2 - Item Quantity Figure

10/112 If you plan to install the cablemanagement of the LXr Pro: attachthe mounting block to the rear endof a mounting rail with one 6-32 ×3/8"

Page 3

11/11NetShelter is a trademark of American Power Conversion. Torx is a registered trademark of Camcor/Tex-tron, Inc. All other trademarks are property

Page 4

2/11Tools RequiredTo install the Mounting Rail Kit for HP Shelving (AR8001), you will need the following hand tools:• Screwdrivers (flat blade and Phi

Page 5

3/11Section 1 — Mounting Instructions for J1456A, J1496ATo install J1456A or J1496A into an APC NetShelter, follow the steps in Table 3 below.Table 3:

Page 6

4/11Section 2 — Mounting Instructions for J1451A/B, J1452A/B, J1491ATo install J1451A/B, J1452A/B, or J1491A into an APC NetShelter, follow the steps

Page 7

5/11Table 4: Installation Procedure for J1451A/B, J1452A/B, J1491AStep Action FigureRemove the slides from the server shelf assembly:1 Place the shelf

Page 8

6/115 If you plan to install the bezel:install M6 caged nuts into thesquare mounting holes next to eachof the upper pencil marks that youmade in Step

Page 9

7/11Attach the server shelf to the mounted slides, install the cable management arm (optional), NetServer, andbezel (optional).9 To attach the server

Page 10 - Step Action Figure

8/11Section 3 — Mounting Instructions for J1455ATo install J1455A into an APC NetShelter, follow the steps in Table 5 below.Table 5: Installation Proc

Page 11

9/11Section 4— Mounting Instructions for LXr ProTo install the HP LXr Pro into an APC NetShelter, follow the steps in Table 6 below.3 To install the s

Comments to this Manuals

No comments