APC SUVTOPT002 Datasheet

Browse online or download Datasheet for Rack accessories APC SUVTOPT002. APC Smart-UPS VT Conduit Box User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Smart-UPS

Smart-UPS® VT10-40kVA400VSite Preparation andInstallation Manual

Page 2

2Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986General Safety InstructionsThis guide contains important instruction

Page 3 - VT 10-40kVA 400V

Introduction – General Safety InstructionsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 3General safetyWARNING!All

Page 4

Introduction – General Safety Instructions4Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986WARNING!When replacing a b

Page 5 - Contents

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 5UPS Family Range and Components14in/351mm Enclosures20in/523mm Encl

Page 6

Introduction – UPS Family Range and Components6Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986UPS sizes, weights and

Page 7

Introduction – UPS Family Range and ComponentsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 7Front PanelsInstall t

Page 8

Introduction – UPS Family Range and Components8Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Stabilizing BracketAlw

Page 9 - Introduction

Introduction – UPS Family Range and ComponentsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 9User interface Displ

Page 10 - General Safety Instructions

10 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986OptionsExtended Run Battery Enclosure (XR Enclosure) and Battery M

Page 11 - General safety

Introduction – OptionsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 11Part Numbers for XR EnclosuresPart Number fo

Page 12 - 4Smart-UPS

This manual is available in English on the enclosed CD.Uživatelská pøíruèka v èeštinì je k dispozici na pøiloženém CD.Dieses Handbuch ist in Deutsch a

Page 13 - 20in/523mm Enclosures

Introduction – Options12 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Maintenance Bypass Panels with Power Distrib

Page 14 - Battery Module

Introduction – OptionsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 13NoteFor more details on optional APC equipme

Page 15 - Front Panels

14 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Site Preparation (UPS and XR)Installation Space Requirements Clear

Page 16 - Stabilizing Bracket

Site Preparation (UPS and XR) – Installation Space RequirementsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 15Cle

Page 17 - User interface

Site Preparation (UPS and XR) – Installation Space Requirements16 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Cle

Page 18 - – 990-1986

Site Preparation (UPS and XR) – Installation Space RequirementsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 17Cle

Page 19

18 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Seismic Anchoring PreparationDrilling floor holes for seismic anch

Page 20 - Introduction – Options

Site Preparation (UPS and XR) – Seismic Anchoring PreparationSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 19NoteR

Page 21 - VT, contact APC

20 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Operating EnvironmentOperating conditionsHeat dissipationAudible n

Page 22 - Site Preparation (UPS and XR)

Site Preparation (UPS and XR) – Operating EnvironmentSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 21Recommended s

Page 23 - Space requirements in mm

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 1Smart-UPS® VT 10-40kVA 400V Site Preparation and Installation Manua

Page 24

Site Preparation (UPS and XR) – Operating Environment22 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Recommended c

Page 25

Site Preparation (UPS and XR) – Operating EnvironmentSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 23Minimum setti

Page 26 - Seismic Anchoring Preparation

Site Preparation (UPS and XR) – Operating Environment24 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Minimum setti

Page 27

Site Preparation (UPS and XR) – Operating EnvironmentSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 25Minimum setti

Page 28 - Operating Environment

Site Preparation (UPS and XR) – Operating Environment26 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Recommended p

Page 29

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 27Basic Wiring OverviewEPOMaintenanceBypass Panel(Optional Equipment

Page 30 - 22 Smart-UPS

28 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Site Preparation ChecklistSystem components. Have you –Site Prepar

Page 31

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 29Electrical InstallationTotal-Power-Off ProcedureSet the DC discon

Page 32 - 24 Smart-UPS

Electrical Installation – Total-Power-Off Procedure30 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Refer to Seismi

Page 33

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 31System-Electrical InformationWARNING!All electrical power and powe

Page 34 - EPO switch wiring

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986

Page 35 - Basic Wiring Overview

Electrical Installation – System-Electrical Information32 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Source conn

Page 36 - Site Preparation Checklist

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 33Wiring NoteMake sure the UPS is in its location of use before wiri

Page 37 - Electrical Installation

34 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Input/Output Wiring – Single Mains (default)The UPS is designed fo

Page 38 - WARNING!

Electrical Installation – Input/Output Wiring – Single Mains (default)Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-198

Page 39 - System-Electrical Information

36 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Input/Output Wiring – Dual Mains The UPS is designed for single ma

Page 40 - Source connections

Electrical Installation – Input/Output Wiring – Dual MainsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 37Remove

Page 41

38 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Communication Wiring to EPO and Optional EquipmentJ106 and J108 pi

Page 42 - 34 Smart-UPS

Electrical Installation – Communication Wiring to EPO and Optional Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 3

Page 43 - – 990-1986 35

Electrical Installation – Communication Wiring to EPO and Optional Equipment40 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual

Page 44 - Wiring procedure - dual mains

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 41General Charge SettingThe general charge setting is set to 100% as

Page 45 - – 990-1986 37

ContentsSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 iIntroduction ...

Page 46 - Optional Equipment

42 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Leveling Feet Setting the leveling feet Set the leveling feet to e

Page 47 - – 990-1986 39

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 43Seismic Anchoring (option)Floor attachmentFor seismic protection t

Page 48 - EPO wiring options (J108)

44 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Battery securing Attach two Seismic Battery Brackets per Battery M

Page 49 - General Charge Setting

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 45Front PanelFront Panel installation/removalTo install a Front Pan

Page 50 - Leveling Feet

46 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Wiring Verification Procedure Use following procedure to verify th

Page 51 - Seismic Anchoring (option)

Electrical Installation – Wiring Verification ProcedureSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 47NoteIf a pr

Page 52 - Battery securing

48 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Installation Site ChecklistThis checklist should be completed by t

Page 53 - Front Panel

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 49LIMITED FACTORY WARRANTYThe limited warranty provided by American

Page 54 - 46 Smart-UPS

50 Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Drawings, descriptionsAPC warrants for the Warranty Period and on

Page 55

Electrical Installation – LIMITED FACTORY WARRANTYSmart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 51SERVICE IN CONNE

Page 56 - Installation Site Checklist

ii Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986Operating Environment . . . . . . . . . . . . . . . . . . . . .

Page 57 - LIMITED FACTORY WARRANTY

*990-1986*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the following ways:• Vi

Page 58 - Exclusions

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 iiiSeismic Anchoring (option) . . . . . . . . . . . . . . . . . . .

Page 59

iv Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986

Page 60 - *990-1986*

Smart-UPS® VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986 1IntroductionWelcome to the Site Preparation and Installation Manual

Comments to this Manuals

No comments