2-Post Rack — AR200 & AR201
990-6040A 1/2 6/00
NetShelter
®
®
Unpacking and Inspection
Before unpacking:
1. Inspect the carton for damage. If you detect damage, notify the carrier.
2. Remove the components from the carton and inspect them for shipping damage.
Note:
The mounting hardware is enclosed in a separate plastic bag located inside one of the packaging
inserts glued to the main carton. Remove it before discarding the carton.
Inventory
The following table lists the parts that are included with the NetShelter 2-Post Rack.
To o l s R e q u i r e d
You will need a 9/16" box-end wrench to assemble the rack.
Inventory of the NetShelter 2-Post Rack
Component Quantity
Rack
3" Extruded Upright Rail 2
1½" × 1½" Extruded Top Angle 2
3½" × 6" Extruded Bottom Angle 2
Hardware
3/8"-16 × ¾" Hex Head Bolt 12
3/8" Split Lock Washer 12
#12-24 Screw (for installing equipment) 24
Comments to this Manuals