®NetShelter®Standard EnclosureAR500User’s Manual
6Receiving, Inspection & Configuration continuedTaking inventoryAfter unpacking the enclosure, verify that all required components and hardware h
7Stabilizing the EnclosureWarning To avoid tipping damage or personal injury, move the enclosure to its permanent location and level it before you loa
8Customizing the EnclosurePreliminary InformationThe enclosure is complete upon arrival and needs no further assembly. This chapter provides instructi
9Reversing the DoorThe front and rear doors may be removed or reversed to accommodate various site configurations. To reverse a door:1. Remove the doo
10Installing EquipmentFor specific information on how to mount rack-equipment in the enclosure, see the installation instructions provided with the eq
11Installing Equipment continuedCaged nuts During installation of equipment in you enclosure, you may need to install or remove caged nuts.Warning In
12Cable ManagementRemoving the roofYou can remove the roof of the enclosure to install a NetShelter Fan Tray (AR8210, AR8211) or to improve cable acce
13Cable Management continuedThree floor openings for cable accessThe floor of the enclosure has three openings for cable access: one large opening in
14Vertical Mounting RailsThe vertical mounting rails are preset for use with Compaq® rack-mountable equipment, at a depth of 29.13" (739 mm). Fro
15Vertical Mounting Rails continuedMoving the rails 1. Refer to “Adjusting the rails” on page 14. Use the 5 mm Allen wrench (included) to remove the
This manual is available in English on the enclosed NetShelter CD.Dieses Handbuch ist in Deutsch auf der beiliegenden NetShelter CD-ROM verfügbar.Este
16Joining EnclosuresTo join two or more enclosures together to form a larger, multi-bay enclosure:1. Place the enclosures together, with their frames
17Product SpecificationsWarranty InformationLimited warrantyAPC warrants the NetShelter Standard Enclosure to be free from defects in materials and wo
18SpecificationsItem MeasurementHeight 76.4 in. (194 cm)Width 24.0 in. (60.7 cm)Depth 34.4 in. (87.4 cm)Clearance (for wiring between front door and v
APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the following ways:• Visit the AP
iContentsIntroduction and Setup . . . . . . . . . . . . . . . . . . . . .1Product Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
iiContents continuedCable Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12Removing the roof 12Three floor openings for cab
1Introduction and SetupProduct OverviewThis American Power Conversion (APC) NetShelter® Standard Enclosure (AR500) provides storage for industry-stand
2InventoryMain components Front door Side panels Rear door Casters/leveling feet Vertical mounting rails Frame (front & rear) Braces (to
3Inventory continuedHardware inventoryItemQuantityM6 × 16 mm Phillips/slotted screws 30Caged nut tool 1M6 caged nuts 30Plastic cup washers 3013 mm/14
4Receiving, Inspection & ConfigurationWarnings and cautions Before you begin to unpack the enclosure, read the following warnings to prevent injur
5Receiving, Inspection & Configuration continuedUnpacking procedure1. Move the shipping pallet containing the enclosure to a firm, level surface.
Comments to this Manuals