APC EP Zero ARF Instruction Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
13
12. Repeat steps 1 through 11 for the right wing.
13. Insert the wing tube into one wing and join the two
wings. You may use epoxy to glue the wings together if you
wish, but it is not required.
FUSELAGE ASSEMBLY
Main Landing Gear Installation
1. Install the main landing gear to the fuselage using six
4-40 x 1/2" [12.7mm] socket-head cap screws, six #4 lock
washers, and six #4 flat washers. Apply a drop of threadlocker
to the screws before installing.
2. The main landing gear leg fairings are only slightly different.
It is difficult to see the difference by just looking at them. We
recommend test fitting both of the landing gear fairings over
the main landing gear and checking the fit. If they are properly
oriented, they should fit against the fuselage closely. If they do
not, try switching them or rotating them front to back.
3. Glue the fairings to the gear legs using R/C-56 canopy
glue around the flange. Clean up any excess glue with a
damp paper towel. Tape the fairings in place. Remove the
tape after the glue dries.
4. Install an axle onto a landing gear leg using a 5/16-24
lock nut. Using a felt tipped pen, mark the bottom side of
each axle as shown. Make one mark 3/16" [4.8mm] from the
base of the axle and the other mark 1-1/8" [29mm] from the
base of the axle.
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 31 32

Comments to this Manuals

No comments