Installation
InRow
®
RP CW
ACRP500
ACRP501
ACRP502
Page view 0
1 2 3 4 5 6 ... 55 56

Summary of Contents

Page 1

InstallationInRow® RP CWACRP500ACRP501ACRP502

Page 2 - 동봉된 CD 안에 한국어 매뉴얼이 있습니다

InRow RP CW Installation2Safety Note: All work should be performed by American Power Conversion (APC®) authorized personnel only. Follow all local and

Page 3

3InRow RP CW InstallationInspecting the EquipmentYour APC InRow RP air conditioner has been tested and inspected for quality assurance before shipment

Page 4

InRow RP CW Installation4Model IdentificationThe model number can be found on the outside of the shipping crate and on the nameplate located inside th

Page 5 - Contents

5InRow RP CW InstallationComponent IdentificationInstall kit inventoryItem Description Quantity Item Description QuantityInsertion adapter 2Strain r

Page 6

InRow RP CW Installation6Exterior componentsRemovable rear doorsCasterSide panel lockDoor handle and lockRemovable side panelDisplay interfaceA

Page 7

7InRow RP CW InstallationInterior components (front)Electrical heater Electrical panelFanMain feed breakersFan guardUser interface connectorsHu

Page 8

InRow RP CW Installation8Interior components (rear)Chilled water coilRear doorsChilled water control actuatorAir filtersChilled water three-way v

Page 9 - General Information

9InRow RP CW InstallationElectrical panelTransformersUser interface connectorsMain controller boardRelay boardGround lugMain circuit breaker — p

Page 10 - InRow RP CW Installation2

InRow RP CW Installation10Main controller boardNetwork Management CardCRAC controller single inline memory module (SIMM)Differential Pressure SIMM

Page 11 - Moving the Equipment

11InRow RP CW InstallationPiping DiagramsNote: Top or bottom entry can be chosen individually for each type of connection, i.e. power, condensate drai

Page 12 - Model Identification

This manual is available in English on the enclosed CD.Dieses Handbuch ist in Deutsch auf der beiliegenden CD-ROM verfügbar.Deze handleiding staat in

Page 13 - Component Identification

InRow RP CW Installation12ConnectionsAll connections to and from the equipment can be made through either the top or the bottom of the equipment. All

Page 14 - Exterior components

13InRow RP CW InstallationPre-InstallationRoom preparationDuring the design of the data center, consider ease of entry for the equipment, floor loadin

Page 15 - Interior components (front)

InRow RP CW Installation14Service accessAn area of minimum 900 mm (36 in) of clear floor space in front of and behind the equipment is recommended for

Page 16 - Interior components (rear)

15InRow RP CW InstallationDimensions and WeightDimensionsDimensions are shown in mm (in).WeightModel Weight of equipment, packedWeight of equipment,un

Page 17 - Electrical panel

InRow RP CW Installation16Piping and Power Access LocationsTop piping and power access locations (top view)Dimensions are shown in mm (in).Chilled wa

Page 18 - Main controller board

17InRow RP CW InstallationBottom piping and power access locations (bottom view)Dimensions are shown in mm (in).Chilled water supplyChilled water re

Page 19 - Piping Diagrams

InRow RP CW Installation18InstallationJoining the Equipment to EnclosuresJoining to NetShelter® SX enclosuresThe equipment comes with four joining bra

Page 20 - Connections

19InRow RP CW InstallationRemoving the Doors and PanelsRemoving the front and rear doors1. Unlock and open the door 90 degrees. 2. Unplug the ground w

Page 21 - Pre-Installation

InRow RP CW Installation20Removing the side panelInstalling the side panelna2315ana2316a

Page 22 - Service access

21InRow RP CW InstallationRemoving the electrical panel coverRemove the electrical panel cover to install the main power cable.1. Remove the five M4 s

Page 23 - Dimensions and Weight

American Power Conversion Legal DisclaimerThe information presented in this manual is not warranted by the American Power Conversion Corporation to be

Page 24 - InRow RP CW Installation16

InRow RP CW Installation22Leveling the EquipmentNote: The leveling feet at the corners of the equipment provide a stable base if the floor is uneven,

Page 25 - 17InRow RP CW Installation

23InRow RP CW InstallationMechanical ConnectionsTop water pipingNote: The top chilled water supply pipe is supplied with the equipment and must be ins

Page 26 - Installation

InRow RP CW Installation24Bottom water piping1. Remove the insulation cap from the union  (not shown).2. Remove the union nut , and save it for reus

Page 27 - Removing the Doors and Panels

25InRow RP CW InstallationHumidifierThe humidifier water supply line is routed to the unit in flexible tubing (or alternative tubing approved by local

Page 28 - Installing the side panel

InRow RP CW Installation26Condensate pumpThe pump is factory-wired and piped internally to the condensate drain pan and humidifier outlet. The pump ca

Page 29 - 21InRow RP CW Installation

27InRow RP CW InstallationCondensate overflowCaution: Failing to perform the following procedure may result in condensate pan overflow and possible da

Page 30 - Leveling the Equipment

InRow RP CW Installation28Leak sensorInstall up to four optional leak sensors (AP9326) as needed.1. Connect the leak sensor to the equipment using the

Page 31 - Mechanical Connections

29InRow RP CW InstallationFilling and Purging the UnitWhen the unit has been properly piped, begin the filling process (top piping configuration shown

Page 32 - Bottom water piping

InRow RP CW Installation30ChillerThree types of chillers can be connected to the unit:• APC size-matched chiller/thermal storage system• Building ch

Page 33 - Humidifier

31InRow RP CW InstallationElectrical ConnectionsThe following electrical connections are required in the field:• Controls (user interface, Network Ma

Page 35 - Condensate overflow

InRow RP CW Installation32User interface connectorsRack inlet temperature sensors 1, 2, 3A-Link INA-Link OUTNetwork portConsole portCustomer out

Page 36 - Leak sensor

33InRow RP CW InstallationDescription of user interface connectorsItem DescriptionRack temperature sensors 1, 2, 3 Three temperature sensors which mu

Page 37 - Filling and Purging the Unit

InRow RP CW Installation34Modbus D1 (RXTX+) Connections for Building Management System. Wire a 150 Ohm terminator resistor (supplied) into the final

Page 38 - °C (45–55°F)

35InRow RP CW InstallationRack temperature sensorsThe rack temperature sensors control the unit airflow and ensure adequate supply of cooling air to t

Page 39 - Electrical Connections

InRow RP CW Installation36Water outlet temperature sensorsThere are two water outlet temperature sensors, one for top connection and one for bottom co

Page 40 - User interface connectors

37InRow RP CW InstallationCommunication connectionsA-Link connections. The A-Link bus connection allows communication between equipment. Only one InRo

Page 41 - Item Description

InRow RP CW Installation38Building Management System (BMS). The Modbus interface allows each InRow RP to communicate with the BMS. Use a three-wire ca

Page 42

39InRow RP CW InstallationNetwork portThe Network port allows communication from the InRow RP to the network.Network portLAN cable (10/100 Base-T)Sw

Page 43 - Rack temperature sensors

InRow RP CW Installation40Power ConnectionsWiring configurationsElectrical Hazard: Only a licensed electrician may connect the equipment to utility po

Page 44 - Wire with green and

41InRow RP CW InstallationStrain relief (ACRP502 only)Adjustable metal strain reliefs are provided. See “Install kit inventory” on page 5.1. Hook one

Page 45 - Communication connections

ContentsInRow RP CW InstallationiGeneral Information... 1Overview . . . . . . . . . . . . . . .

Page 46 - InRow RP CW Installation38

InRow RP CW Installation42WarrantyOne-Year Factory WarrantyThe limited warranty provided by American Power Conversion (APC®) in this Statement of Limi

Page 47 - Network port

43InRow RP CW InstallationIN NO EVENT SHALL APC, ITS OFFICERS, DIRECTORS, AFFILIATES OR EMPLOYEES BE LIABLE FOR ANY FORM OF INDIRECT, SPECIAL, CONSEQU

Page 48 - Power Connections

InRow RP CW Installation44Warranty ProceduresClaimsTo obtain service under the warranty, contact APC Customer Support (see the back cover of this manu

Page 51 - Warranty claims

Radio Frequency InterferenceChanges or modifications to this unit not expressly approved by the party responsible for compliance could void the user’s

Page 52 - Warranty Procedures

04/2008990-2710B-001*990-2710B-001*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any o

Page 53

InRow RP CW InstallationiiInstallation... 18Joining the Equipment to Enclosures .

Page 54

InRow RP CW InstallationiiiWarranty ...42One-Year Factory Warranty . . . . . .

Page 56 - *990-2710B-001*

1InRow RP CW InstallationGeneral InformationOverviewSave these instructionsThis manual contains important instructions that must be followed during th

Comments to this Manuals

No comments