JANUARY 2008 UCCS STANDARDS 15950-1 UCCS Temperature Control Specifiers Guide Mechanical Division 15950: Basic Control Materials and Methods
JANUARY 2008 UCCS STANDARDS 15950-10 two- to four-hour sessions over the life of the warranty period. All instructional material shall be avail
JANUARY 2008 UCCS STANDARDS 15950-11 E. The Contractor shall optimize all control software and tune all control loops to assure a
JANUARY 2008 UCCS STANDARDS 15950-12 3. Project database, 4. Job-specific application programming code, 5. All other documentation. PART
JANUARY 2008 UCCS STANDARDS 15950-13 1. 2" - 12" Size; Siemens 2-way Butterfly Assemblies with Siemens Electric Actuators
JANUARY 2008 UCCS STANDARDS 15950-14 e. Desiccant Compressed Air Dryer 1. Hankison Dehydrafilter, or approved equal. 7. Actuators and Posi
JANUARY 2008 UCCS STANDARDS 15950-15 4. Duct-mounted a. (UCCS to add preferred manufacturer here) 10. Transmitters - Solid State a. Wate
JANUARY 2008 UCCS STANDARDS 15950-16 1. Barksdale, Mercoid series 1000 or pre-approved equal. c. Horn Strobe 1. Federal Model 400ST with M
JANUARY 2008 UCCS STANDARDS 15950-17 2.02 AIR TUBING AND CONTROL WIRING A. Air tubing shall be either copper (ACR) in exposed areas, or Type
JANUARY 2008 UCCS STANDARDS 15950-18 2. Sizing Criteria: a. Two-position service: Line size. b. Two-way modulating service: Pressure
JANUARY 2008 UCCS STANDARDS 15950-19 5. Individual damper sections shall not have a single dimension (length or height) greater than 48".
JANUARY 2008 UCCS STANDARDS 15950-2 SECTION 15950 CONTROLS [Note to Consultant: These standards incorporate the suggested wording for contra
JANUARY 2008 UCCS STANDARDS 15950-20 let within 5’ of the enclosure. G. All control panel locks shall conform to the University standard lock
JANUARY 2008 UCCS STANDARDS 15950-21 3. Refrigerant for the dryer shall be R-134A, or approved, non-CFC, alternate. 4. Dryers Shall be adju
JANUARY 2008 UCCS STANDARDS 15950-22 provide smooth, reliable actuation at all times. Modulating valves shall be complete with positioners by
JANUARY 2008 UCCS STANDARDS 15950-23 a. Pneumatic signals: 0-20 psig. b. Electric signals: 4 to 20 mA 2. Span (calibration) and start po
JANUARY 2008 UCCS STANDARDS 15950-24 2. Line-voltage thermostats shall be UL-listed, SPDT, SPST, or DPST with contact rat- ing suitable for ap
JANUARY 2008 UCCS STANDARDS 15950-25 arrangement and rating suitable for application; line voltage units UL-listed. E. CO2 sensors: 1. (UCCS
JANUARY 2008 UCCS STANDARDS 15950-26 response time. Zero and span shall be adjustable. KELE Model PTXIE, or equal. Install with isolation valv
JANUARY 2008 UCCS STANDARDS 15950-27 2.12 AUXILIARY DEVICES - ELECTRIC A. Flow-proving or equipment-operating-status switches shall be paddle
JANUARY 2008 UCCS STANDARDS 15950-28 I. Refrigerant Vapor Sensor: Analyzer shall be microprocessor-based and employ infrared (lR) se
JANUARY 2008 UCCS STANDARDS 15950-29 provide smooth modulating control under design flow and pressure conditions. 2. Valve actuators shall pro
JANUARY 2008 UCCS STANDARDS 15950-3 flows, shall be by the Balancing Contractor. The Controls Contractor shall provide assis- tance to the
JANUARY 2008 UCCS STANDARDS 15950-30 Installation methods/materials as follows: 1. Concealed and Inaccessible: Copper tubing (type ACR) witho
JANUARY 2008 UCCS STANDARDS 15950-31 D. Provide ball valves or manifold if specified to isolate the instruments from the process. E. Impulse
JANUARY 2008 UCCS STANDARDS 15950-32 I. Low-voltage (24V or less) AC or DC wiring shall not be run in conduit containing 120 VA
JANUARY 2008 UCCS STANDARDS 15950-33 terminal on the controller. C. Expansion Modules: Delta DDC 1. The Controls contractor shall follow th
JANUARY 2008 UCCS STANDARDS 15950-34 1. Not allowed. D. Standard Nomenclature for Valve and Damper Position Description: 1. Set up the
JANUARY 2008 UCCS STANDARDS 15950-35 L. For all applications utilizing outside-air, relief, isolation or exhaust dampers; install an E/P to aut
JANUARY 2008 UCCS STANDARDS 15950-36 3.07 CONTROL PANELS A. Refer to Part 2 - Products for construction details. B. Field wiring shall be
JANUARY 2008 UCCS STANDARDS 15950-37 information. 6. When connecting DDC controllers, terminating of inputs and outputs shall be color code
JANUARY 2008 UCCS STANDARDS 15950-38 formance tests. B. The tests described in this section are to be performed in addition to th
JANUARY 2008 UCCS STANDARDS 15950-39 F. This Contractor shall demonstrate HVAC alarms prior to placing ventilation systems in servi
JANUARY 2008 UCCS STANDARDS 15950-4 and approval. D. Coordination: This Contractor shall interface with controls furnished with equ
JANUARY 2008 UCCS STANDARDS 15950-40 G. System logs, trend logs, and event-initiated logs shall be set up to provide historical and real-
JANUARY 2008 UCCS STANDARDS 15950-41 j. Each miscellaneous monitored or controlled point 2. Menu Penetrations: “Buttons” shall be prov
JANUARY 2008 UCCS STANDARDS 15950-42 temperature controls contractor. The contractor shall confirm that the communication network l
JANUARY 2008 UCCS STANDARDS 15950-5 scope of demolition is unclear, consult with Shop technician prior to bid submittal. Approval from HVAC/Co
JANUARY 2008 UCCS STANDARDS 15950-6 and product data shall be submitted for approval per Division 1, Section 01300. B. Contractor agrees that
JANUARY 2008 UCCS STANDARDS 15950-7 c. Panel software name and serial number d. Type of controller: The network diagram shall depi
JANUARY 2008 UCCS STANDARDS 15950-8 b. Sequence of operation for all controlled and monitored points for each system. Sequence shall be on same
JANUARY 2008 UCCS STANDARDS 15950-9 B. Prior to Final Completion of the installation, prepare complete Operation and Maintenance manuals. Refe
Comments to this Manuals