APC UCCS Temperature Control Specifications

Browse online or download Specifications for Thermostats APC UCCS Temperature Control. APC UCCS Temperature Control Specifications User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
JANUARY 2008 UCCS STANDARDS 15950-1
UCCS Temperature Control Specifiers Guide
Mechanical Division 15950: Basic Control Materials and Methods
I. Part 1 - General
1.01 Special Conditions
1.02 Scope
1.03 Related Work Specified Elsewhere
1.04 Work Included
1.05 Definitions
1.06 Drawing and Specifications
1.07 Submittal Data and Shop Drawings
1.08 Project Record Documents
1.09 Demonstration and Training
1.10 Warranty
1.11 Quality Assurance
1.12 Ownership of Proprietary Material
II. Part 2 - Products
2.01 Manufacturers
2.02 Air Tubing and Control Wiring
2.03 Control Valves
2.04 Control Dampers
2.05 Local Control Panels
2.06 Compressed Air Supply - Pneumatic
2.07 Actuators and Positioners - Pneumatic
2.08 Auxiliary Devices - Pneumatic
2.09 Control Devices - Electric
2.10 Solid-State Sensing Devices
2.11 Transmitters - Solid State
2.12 Auxiliary Devices - Electric
2.13 Actuators and Positioners - Electric
2.14 Safety Controls
III. Part 3 - Execution
3.01 Control-Air Piping
3.02 Control Piping (Liquids)
3.03 Control Wiring
3.04 Delta Controllers
3.05 Installation and Setup Requirements
3.06 Control Device Locations
3.07 Control Panels
3.08 Identification
3.09 Protection
3.10 Cleanup
3.11 Testing
3.12 Control Execution - General
3.13 Workstation Programming
3.14 Fiber Optics - Networking
3.15 I/O Point Wiring Convention
3.16 DDC Software
IV. Part 4 – Special Instructions
Index
END OF SECTION
Page view 0
1 2 3 4 5 6 ... 41 42

Summary of Contents

Page 1

JANUARY 2008 UCCS STANDARDS 15950-1 UCCS Temperature Control Specifiers Guide Mechanical Division 15950: Basic Control Materials and Methods

Page 2

JANUARY 2008 UCCS STANDARDS 15950-10 two- to four-hour sessions over the life of the warranty period. All instructional material shall be avail

Page 3

JANUARY 2008 UCCS STANDARDS 15950-11 E. The Contractor shall optimize all control software and tune all control loops to assure a

Page 4

JANUARY 2008 UCCS STANDARDS 15950-12 3. Project database, 4. Job-specific application programming code, 5. All other documentation. PART

Page 5

JANUARY 2008 UCCS STANDARDS 15950-13 1. 2" - 12" Size; Siemens 2-way Butterfly Assemblies with Siemens Electric Actuators

Page 6

JANUARY 2008 UCCS STANDARDS 15950-14 e. Desiccant Compressed Air Dryer 1. Hankison Dehydrafilter, or approved equal. 7. Actuators and Posi

Page 7

JANUARY 2008 UCCS STANDARDS 15950-15 4. Duct-mounted a. (UCCS to add preferred manufacturer here) 10. Transmitters - Solid State a. Wate

Page 8

JANUARY 2008 UCCS STANDARDS 15950-16 1. Barksdale, Mercoid series 1000 or pre-approved equal. c. Horn Strobe 1. Federal Model 400ST with M

Page 9

JANUARY 2008 UCCS STANDARDS 15950-17 2.02 AIR TUBING AND CONTROL WIRING A. Air tubing shall be either copper (ACR) in exposed areas, or Type

Page 10

JANUARY 2008 UCCS STANDARDS 15950-18 2. Sizing Criteria: a. Two-position service: Line size. b. Two-way modulating service: Pressure

Page 11

JANUARY 2008 UCCS STANDARDS 15950-19 5. Individual damper sections shall not have a single dimension (length or height) greater than 48".

Page 12

JANUARY 2008 UCCS STANDARDS 15950-2 SECTION 15950 CONTROLS [Note to Consultant: These standards incorporate the suggested wording for contra

Page 13

JANUARY 2008 UCCS STANDARDS 15950-20 let within 5’ of the enclosure. G. All control panel locks shall conform to the University standard lock

Page 14

JANUARY 2008 UCCS STANDARDS 15950-21 3. Refrigerant for the dryer shall be R-134A, or approved, non-CFC, alternate. 4. Dryers Shall be adju

Page 15

JANUARY 2008 UCCS STANDARDS 15950-22 provide smooth, reliable actuation at all times. Modulating valves shall be complete with positioners by

Page 16

JANUARY 2008 UCCS STANDARDS 15950-23 a. Pneumatic signals: 0-20 psig. b. Electric signals: 4 to 20 mA 2. Span (calibration) and start po

Page 17

JANUARY 2008 UCCS STANDARDS 15950-24 2. Line-voltage thermostats shall be UL-listed, SPDT, SPST, or DPST with contact rat- ing suitable for ap

Page 18

JANUARY 2008 UCCS STANDARDS 15950-25 arrangement and rating suitable for application; line voltage units UL-listed. E. CO2 sensors: 1. (UCCS

Page 19

JANUARY 2008 UCCS STANDARDS 15950-26 response time. Zero and span shall be adjustable. KELE Model PTXIE, or equal. Install with isolation valv

Page 20

JANUARY 2008 UCCS STANDARDS 15950-27 2.12 AUXILIARY DEVICES - ELECTRIC A. Flow-proving or equipment-operating-status switches shall be paddle

Page 21

JANUARY 2008 UCCS STANDARDS 15950-28 I. Refrigerant Vapor Sensor: Analyzer shall be microprocessor-based and employ infrared (lR) se

Page 22

JANUARY 2008 UCCS STANDARDS 15950-29 provide smooth modulating control under design flow and pressure conditions. 2. Valve actuators shall pro

Page 23

JANUARY 2008 UCCS STANDARDS 15950-3 flows, shall be by the Balancing Contractor. The Controls Contractor shall provide assis- tance to the

Page 24

JANUARY 2008 UCCS STANDARDS 15950-30 Installation methods/materials as follows: 1. Concealed and Inaccessible: Copper tubing (type ACR) witho

Page 25

JANUARY 2008 UCCS STANDARDS 15950-31 D. Provide ball valves or manifold if specified to isolate the instruments from the process. E. Impulse

Page 26

JANUARY 2008 UCCS STANDARDS 15950-32 I. Low-voltage (24V or less) AC or DC wiring shall not be run in conduit containing 120 VA

Page 27

JANUARY 2008 UCCS STANDARDS 15950-33 terminal on the controller. C. Expansion Modules: Delta DDC 1. The Controls contractor shall follow th

Page 28

JANUARY 2008 UCCS STANDARDS 15950-34 1. Not allowed. D. Standard Nomenclature for Valve and Damper Position Description: 1. Set up the

Page 29

JANUARY 2008 UCCS STANDARDS 15950-35 L. For all applications utilizing outside-air, relief, isolation or exhaust dampers; install an E/P to aut

Page 30

JANUARY 2008 UCCS STANDARDS 15950-36 3.07 CONTROL PANELS A. Refer to Part 2 - Products for construction details. B. Field wiring shall be

Page 31

JANUARY 2008 UCCS STANDARDS 15950-37 information. 6. When connecting DDC controllers, terminating of inputs and outputs shall be color code

Page 32

JANUARY 2008 UCCS STANDARDS 15950-38 formance tests. B. The tests described in this section are to be performed in addition to th

Page 33

JANUARY 2008 UCCS STANDARDS 15950-39 F. This Contractor shall demonstrate HVAC alarms prior to placing ventilation systems in servi

Page 34

JANUARY 2008 UCCS STANDARDS 15950-4 and approval. D. Coordination: This Contractor shall interface with controls furnished with equ

Page 35

JANUARY 2008 UCCS STANDARDS 15950-40 G. System logs, trend logs, and event-initiated logs shall be set up to provide historical and real-

Page 36

JANUARY 2008 UCCS STANDARDS 15950-41 j. Each miscellaneous monitored or controlled point 2. Menu Penetrations: “Buttons” shall be prov

Page 37

JANUARY 2008 UCCS STANDARDS 15950-42 temperature controls contractor. The contractor shall confirm that the communication network l

Page 38

JANUARY 2008 UCCS STANDARDS 15950-5 scope of demolition is unclear, consult with Shop technician prior to bid submittal. Approval from HVAC/Co

Page 39

JANUARY 2008 UCCS STANDARDS 15950-6 and product data shall be submitted for approval per Division 1, Section 01300. B. Contractor agrees that

Page 40

JANUARY 2008 UCCS STANDARDS 15950-7 c. Panel software name and serial number d. Type of controller: The network diagram shall depi

Page 41

JANUARY 2008 UCCS STANDARDS 15950-8 b. Sequence of operation for all controlled and monitored points for each system. Sequence shall be on same

Page 42

JANUARY 2008 UCCS STANDARDS 15950-9 B. Prior to Final Completion of the installation, prepare complete Operation and Maintenance manuals. Refe

Comments to this Manuals

No comments