Schneider Electric Critical Power and Cooling Services www.apc.com Rev 2/08/11
- 1 - Cooling Assembly Service
Statement
of Work
C
C
o
o
o
o
l
l
i
i
n
n
g
g
A
A
s
s
s
s
e
e
m
m
b
b
l
l
y
y
S
S
e
e
r
r
v
v
i
i
c
c
e
e
Implementation Services Service
Table of Contents
1.0 Executive
Summary
2.0 Features &
Benefits
3.0 Details of Service
4.0 Assumptions
5.0 Scope of
Responsibility
6.0 Project Work
Details
7.0 Pricing
8.0 Terms &
Conditions
1.0 Executive Summary
Schneider Electric Critical Power and Cooling Services (CPCS) Cooling Assembly Service is a key
part of a complete deployment of air conditioning equipment in data centers, server rooms and
wiring closets. This service provides the certified CPCS engineers needed to quickly and efficiently
assemble your Cooling product. The result provides the customer with the assurance the Cooling
System has been installed properly and to CPCS specifications.
2.0 Features & Benefits
Features Benefits
Service provided 5X8 or 7 X 24
A flexible service program to meet customers varying business
operations requirements.
Provide qualified and approved
service personnel
Assembly time is minimized when utilizing trained and qualified
personnel.
Scheduling and delivery
coordination
Avoidance of possible delays caused by scheduling and delivery
conflicts.
Removal of packaging materials
to a customer designated onsite
disposal area
Frees customer resources from disposal of trash material allowing
them to utilize the space for their core operations in a timely fashion.
Customer specific site
documentation
Provides the customer a record of service date, scope and
personnel that can be retained for future reference.
3.0 Details of Service
The specific features and deliverables of this service are listed below. For each service item listed
below, a single printed document summarizing all the data recorded will be provided.
Site Environment
Activities Description
Environmental Requirements
CPCS will check that the site environment is suitable for the
installation of the InfraStruXure System(s) and record the actual
ambient conditions
Equipment Inspection
CPCS will ascertain if the equipment was properly handled and
unpacked, and will inspect for signs of damaged or missing
hardware prior to assembly
Page view 0
1 2 3 4 5

Summary of Contents

Page 1 - Statement

Schneider Electric Critical Power and Cooling Services www.apc.com

Page 2 - Activities Description

Schneider Electric Critical Power and Cooling Services www.apc.com

Page 3 - 4.0 Assumptions

Schneider Electric Critical Power and Cooling Services www.apc.com

Page 4 - 6.0 Project Work Details

Schneider Electric Critical Power and Cooling Services www.apc.com

Page 5 - 8.0 Terms and Conditions

Schneider Electric Critical Power and Cooling Services www.apc.com