InstallationInRow® RDFluid CooledACRD200ACRD201
InRow Fluid Cooled RD Installation2Safety Note: All work should be performed by American Power Conversion (APC®) authorized personnel only. Follow all
3InRow Fluid Cooled RD InstallationInspecting the EquipmentYour American Power Conversion (APC) InRow® RD air conditioner has been tested and inspecte
InRow Fluid Cooled RD Installation4Model IdentificationThe model number can be found on the outside of the shipping crate and on the nameplate located
5InRow Fluid Cooled RD InstallationComponent IdentificationInstall kitNote: Do not discard the install kit.The install kit contains items which may be
InRow Fluid Cooled RD Installation6Exterior components (front)Removable rear doorAdjustable leveling footSide panel latchDisplay interfaceRemovab
7InRow Fluid Cooled RD InstallationInterior components (front)Electrical control box 1 (retractable)CompressorElectrical control box 2Front air bl
InRow Fluid Cooled RD Installation8Interior components (rear)Temperature sensor (7 total)Sight glassFilter/dryerElectrical control box 2Pressure
9InRow Fluid Cooled RD InstallationElectrical panelLeak detector portBuilding management system (BMS) RS-485 portRemote temperature sensor portCon
InRow Fluid Cooled RD Installation10Top piping and power access locationsBottom piping and power access locationsElectrical power inputLiquid inLow
11InRow Fluid Cooled RD InstallationPiping DiagramsNote: Top or bottom entry can be chosen individually for each type of connection, i.e. power, conde
This manual is available in English on the enclosed CD.Dieses Handbuch ist in Deutsch auf der beiliegenden CD-ROM verfügbar.Deze handleiding staat in
InRow Fluid Cooled RD Installation12Glycol cooled pipingNote: Bottom piping shown.Expansion tank*Hose bibs*Tank fill*Gate valves*Fluid-coolerPum
13InRow Fluid Cooled RD InstallationConnections OverviewAll connections to and from the equipment can be made through either the top or the bottom of
InRow Fluid Cooled RD Installation14Room PreparationAir distributionThe equipment distributes air in a back-to-front discharge pattern, removing hot a
15InRow Fluid Cooled RD InstallationInstallationRemoving Doors and PanelsDoor removalSide panel removalna2631aWarning: All doors and side panels must
InRow Fluid Cooled RD Installation16Positioning the EquipmentRemove the compressor shipping bracketCaution: Failure to complete the following steps ma
17InRow Fluid Cooled RD InstallationService accessA minimum of 900 mm (36 in) of clear floor space in front of and behind the equipment is recommended
InRow Fluid Cooled RD Installation18Leveling the EquipmentNote: The leveling feet at the corners of the equipment provide a stable base if the floor i
19InRow Fluid Cooled RD InstallationJoining the Equipment to EnclosuresJoining to NetShelter® SX enclosuresThe equipment comes with four joining brack
InRow Fluid Cooled RD Installation20Mechanical ConnectionsLiquid pipingNote: Install all piping in accordance with applicable industry guidelines as w
21InRow Fluid Cooled RD InstallationRouting the condensate pump drain line. Route the condensate drain line through the top or the bottom of the equip
American Power Conversion Legal DisclaimerThe information presented in this manual is not warranted by the American Power Conversion Corporation to be
InRow Fluid Cooled RD Installation22Leak sensor (optional)Install one leak sensor (AP9325). To extend the leak sensor length, add up to three addition
23InRow Fluid Cooled RD InstallationElectrical ConnectionsThe electrical connections required in the field are:• Controls (display interface, Network
InRow Fluid Cooled RD Installation24User interface connectionsA-Link ports: Pin 1-High; Pin 2-Low; Pins 3, 6-Perf Power; Pins 4, 5-GroundAlarm NO (n
25InRow Fluid Cooled RD InstallationForm C alarm contacts and shutdown inputSee items 6 through 13 in “User interface connections” on page 24. A relay
InRow Fluid Cooled RD Installation26Rack temperature sensorThe rack temperature sensor monitors and controls the equipment airflow and ensures an adeq
27InRow Fluid Cooled RD InstallationA-Link connectionsThe A-Link bus connection allows multiple InRow RDs (up to twelve) to communicate with one anoth
InRow Fluid Cooled RD Installation28Building Management System (BMS)The Modbus interface allows each InRow RD to communicate with the BMS. Use a three
29InRow Fluid Cooled RD InstallationNetwork portNetwork portLAN cable (10/100 Base-T)na2679aSwitch/HubInRow RD #1 InRow RD #2 Final InRow RD
InRow Fluid Cooled RD Installation30OHE connectionsClass 2 transformer - line voltage to 24 vacFluid flow switchOHE COMOHE NOna2780aInRow RD #1 In
31InRow Fluid Cooled RD InstallationPower ConnectionsWiring configurationsRoute incoming power to the electrical junction box located at the top or bo
InRow Fluid Cooled RD Installation32WarrantyOne-Year Factory WarrantyThe limited warranty provided by American Power Conversion (APC®) in this Stateme
33InRow Fluid Cooled RD InstallationIN NO EVENT SHALL APC, ITS OFFICERS, DIRECTORS, AFFILIATES OR EMPLOYEES BE LIABLE FOR ANY FORM OF INDIRECT, SPECIA
InRow Fluid Cooled RD Installation34Warranty ProceduresClaimsTo obtain service under the warranty, contact APC Customer Support (see the back cover of
Radio Frequency InterferenceChanges or modifications to this unit not expressly approved by the party responsible for compliance could void the user’s
03/2008990-3213-001*990-3213-001*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of
ContentsInRow Fluid Cooled RD InstallationiGeneral Information... 1Overview . . . . . . . . . .
InRow Fluid Cooled RD InstallationiiInstallation... 15Removing Doors and Panels . .
InRow Fluid Cooled RD InstallationiiiWarranty Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34Claims . . . . .
1InRow Fluid Cooled RD InstallationGeneral InformationOverviewSave these instructionsThis manual contains important instructions that must be followed