Installing Multiple Management Cards
Two models of expansion chassis
If you need management card slots in addition to those in your UPS, use one or
more expansion chassis available from APC.
Installing cards in an expansion chassis
Install the lowest-priority cards in any available card slots in the UPS, and then
use an expansion chassis for remaining higher-priority cards. In a Triple
Expansion Chassis:
• Install each card, starting with the lowest priority (see “Before you start”
on page 1) in the lowest-numbered slot.
• If you are installing a Network Management Card, install it in slot 3,
even if you are leaving another slot empty.
Installing cards in expansion chassis set up serially
If you have increased your management card capacity by connecting multiple
expansion chassis serially (in a cascading setup), install the Network
Management Card in the highest-numbered slot, and the Out-of-Band
Management Card in the second-highest-numbered slot of the chassis installed
farthest from the UPS.
Warning: Do not attach more than two Network Management
Cards or one Building Management Integration Card to a UPS.
If the Network Management Card is pre-installed in the UPS, refer instead to
“When a management card has been pre-installed” on page 4.
Chassis Compatible UPSs
Expansion Chassis (AP9600), one slot APC UPSs that are not installed
in a rack or enclosure.
Triple Expansion Chassis (AP9604BLK), three
slots
All APC UPSs
21
Status
Power
Monitoring Port
To U P S
24 VDC
–+
3
Probes
1 2
Sensor Zones
AP9612 TH Envi ronmenta l Moni toring Car d
1 2 3 4
GND
Management Port
Stat us
AP9608 Out- of-Band M anagemen t Card
1
2
3
Smar t Sl ot
A 963 Network Management Card 2P1
USB
Config
Universal I/O Universal I/O
Reset
10/100
Network
mph0461