InfraStruXure Power Distribution Unit 40kW Instructions for Electricians 2
Connection Instructions
Safety
Connections are to be performed by a licensed electrician only!
Electrical Hazard!
The following procedures require a licensed electrician:
•Connection of utility conductors
•Installation of an upstream circuit breaker
•Connection to the Main Input switch
•Wiring under the floor
•Connection of an EPO switch
Connect Utility Conductors and EPO Switch
Electrical requirements
208 V Input 480 V Input 600 V Input
Service distribution breaker
†‡
175 A 80 A 60 A
Conductors to Main Input switch
and system grounding bus
†
Transformer: 3W + G + GEC
No Transformer: 4W + G
3W + G + GEC 3W + G + GEC
Maximum input conductor wire size
(for S3–S4 frame)
250 kcmil 250 kcmil 250 kcmil
Type of lugs for input conductors Saddle lugs Saddle lugs Saddle lugs
Recommended wire sizing
‡
L1, L2, L3, N 3/0 AWG 4 AWG 4 AWG
G 6 AWG 8 AWG 8 AWG
GEC 4 AWG 4 AWG 4 AWG
†
Provided by customer.
‡
The specifications are recommendations. Consult the NEC and local codes for requirements specific to your installation.