2 InfraStruXure System – Service Manual – Installation and Start-Up 990-1467C
Warnings
Installation/Maintenance
Only a certified electrician can perform these tasks:
Connect the PDU to utility
Connect the cross tie output breaker to another PDU
Connect a switch to the EPO interface on the PDU
Only a certified electrician or an APC Field Service Engineer can perform these tasks:
Connect the PDU to the Symmetra PX UPS
Perform maintenance of the PDU
When you connect the PDU to utility, you must install a circuit breaker to protect the PDU against over-
current. Determine the type of circuit breaker that you need to install:
Maintenance performed while the PDU is receiving input power
APC does not recommend that you perform maintenance of the PDU while it is receiving input power.
However, due to the critical nature of data center loads, this may occur. If you must perform maintenance
while the PDU is receiving input power, observe the following precautions to reduce the risk of electric
shock:
1. Never work alone.
2. Perform the maintenance only if you are a certified electrician who is trained in the hazards of live
electrical installation.
3. Know the procedure for disconnecting electricity to the PDU and the data center in case of an
emergency.
4. Wear appropriate personal protective equipment.
5. Use double-insulated tools.
6. Always follow local and site regulations when working on the PDU.
Input Voltage Circuit Breaker Sizing
208V 350A
480V 150A
600V 125A