APC 208 VAC User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 25
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4 Smart-UPS 5000 VA 208/230 Vac Tower/Rack-Mount 5U User Manual
Rack-mount to tower conversion procedure
The UPS and the battery modules are heavy. Remove the battery modules to lighten the UPS during
installation. Refer to the battery removal instructions on the packaging.
Install stabilizer brackets
Stand the UPS on the side with the embossed marks.
Secure a stabilizer bracket (supplied), to both sides of the UPS.
Secure each bracket with two pan head locking screws (supplied).
Install two top covers
Install the large top cover by placing it in the
slots on the UPS and sliding the cover
forward.
Install the small top cover by placing it in the
slots on the UPS and sliding the cover
forward.
Secure the top covers with a #8 black screw
(supplied).
4x
2x
2x
Close and secure the battery doors
Foam spacers
Install batteries
Connect only the first two batteries in the string of three batteries. Be sure that the battery
connectors are fully engages.
Do not connect the single battery or the last battery installed in the string of three batteries.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 24 25

Comments to this Manuals

No comments