APC SUA5000RMI5U/KIT Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4 Smart-UPS 5000 VA 208/230 Vac Tower/Rack-Mount 5U User Manual
Installation
Install unit in rack
Ensure rack stability prior to installing devices in the rack.
When installing rails in the rack, install two cage nuts above each rail, (see diagram below).
Secure the UPS in the rack using the four cage nuts and eight ornamental screws included in the package.
The UPS must be installed at the bottom of the rack.
Second cage nut: count three
holes up from first cage nut
First cage nut: count four holes
up from top edge of rail
3 holes
4 holes
3 holes
4 holes
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 26 27

Comments to this Manuals

No comments