31InRow RD Fluid Cooled Installation
Top routing
1. Remove the electrical junction box
cover.
2. Route electrical cabling into the
electrical junction box as shown.
3. Secure the incoming cable with a
standard 20 mm (3/4-in) nominal
conduit strain relief (not provided).
4. Connect the power wiring to the
terminals as shown and torque the
screws to the value shown on the label.
5. Reinstall the electrical junction box
cover.
Bottom routing
1. Carefully clip all the cable clamps that secure the electrical
cable to the cabinet frame. Remove the cable clamps from the
cabinet and discard.
2. Remove two screws securing the electrical junction box to the
underside of the cabinet top.
3. Remove the plug from the cabinet floor and insert it in the
cabinet top.
4. Turn the electrical junction box over and secure it to the bottom
of the cabinet using the screws removed in step 1. See “Bottom
piping and power access locations” on page 10.
5. Secure the electrical cable to the cabinet frame using new cable
clamps (supplied).
6. To connect electrical power, follow the steps for top routing.
na2645a
na2646a