APC AP9604 Datasheet Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4 Installation
The mounting brackets can be attached at
various positions along the side of the Triple
Chassis using the holes provided. Choose a
position that will not cause the mounted
Triple Chassis or the attached cables to
interfere with closing the cabinet door or to otherwise
protrude from the cabinet. If more than two mounting
holes are aligned, choose the pair that are farthest apart.
3. Mount the Triple Chassis into the NetShelter enclosure
with 4 caged nuts and machine screws (not supplied).
If the Triple Chassis is being installed in a
enclosure other than a NetShelter, use the
hardware that is appropriate for the
enclosure.
4. Connect the female end of the included cable to the 9-
pin male connector labeled “To UPS” on the front of the
Triple Chassis.
5. Connect the male end of the cable to the 9-pin female
computer interface port on the rear of the UPS.
6. If UPS monitoring is to be used, connect the required
cable (940-0024, not supplied) from the 9-pin
monitoring port on the front of the Triple Chassis to an
appropriate serial port on a computer, or to another card.
7. If additional power is needed (see "Power Consider-
ations" on page 5), connect the optional power adapter
output to the power port on the front of the
Triple Chassis.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments