APC 150 kW InfraStruXure Technical Information Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
19
Installation Planning
We will meet with you prior
to installation to offer guid-
ance on how to physically
position and connect the
APC hardware to your cur-
rent infrastructure.
End of Life
[ 1 year ]
APC Global Services
Needs Assessment Services
Our APC Certified Field
Service Engineer will visit
your site and collect data
pertaining to electrical loads,
wiring practices, power quali-
ty, existing power protection
equipment, and environmen-
tal conditions.
Assembly
Once your equipment has
arrived, we will unpack all
components, dispose of all
packaging, position the
equipment in place, assem-
ble the racks, and populate
them with UPS and PDU
components.
Remote Monitoring
Expert outsourced monitor-
ing via APC’s InfraStruXure
Manager.
Factory Acceptance
Testing
This testing, performed at
the factory site, utilizes a
standard set of test proce-
dures for design validation
and to ensure the proper
operation of the product.
For more information, visit www.apc.com
APC customer service continues to be unparalleled in
today’s market. APC was incredibly flexible with our ever-
changing delivery schedule.
Our InfraStruXure™ just
rolled into place and plugged in, quick and easy. Even
with all the extra people, the installation and user
training took only four hours. The installation went
very smoothly.
Every APC professional was very conscientious, right
down to being careful not to scratch the parquet floor.
They even showed us some cable management tech-
niques that made things easier.
InfraStruXure now protects all the major applications in our
Boston location. The ingenious design of the InfraStruXure
minimizes the potential for human error and, therefore,
increases our “peace of mind” quotient. InfraStruXure and
APC are everything we could have asked for—intuitive, scal-
able power protection backed by professionals.”
Industry: Education Application: New Data Center
Steve Painter Senior Vice-President, IS
ACIS
Network Integration
APC Global Services Network
Integration Engineers can assist
in all tasks associated with your
move to a new system, includ-
ing planning the rack configura-
tion, performing server migra-
tion and cable management,
and installing APC management
software.
Start Up
An APC Certified Field Service
Engineer verifies all connections
on your system. Once the unit
has been powered up, we ensure
it is functioning correctly in all
modes of operation. Receive
basic operational instructions to
familiarize you with the compo-
nents of your system.
Project Management
In order to prepare for
installation of your new
APC solution, we will make
sure all electrical or
mechanical contract work is
completed in time for deliv-
ery and set up of the system
components.
APC On-site Repair
Our Field Service Engineers
are trained to isolate and
correct the problem as
quickly as possible. APC
offers flexibility with 4 Hour,
Next Day, and Next
Business Day response
times.
Preventative Maintenance
In order to keep your APC
systems running at maxi-
mum efficiency, APC will
examine your system’s
design to ensure optimal
performance.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24

Comments to this Manuals

No comments