NetShelter VX Four-Post Open FrameUsers Manual 9
Installing the Four-Post Open Frame
To install the frame, you will first level it. You can also provide
additonal stability using any of several methods described in
this section.
Leveling feet Leveling feet are attached under the frame at each corner. The
leveling feet can help provide a stable base if the selected floor
space is uneven, but they are not intended to compensate for a
badly sloped surface. You can remove the casters and leveling
feet to allow the base of the frame to rest directly on the floor.
How to level the
frame
1. Move the frame to a relatively level location.
2. Fit the 14-millimeter end of the open-ended wrench
(included) to the hex head just above the round pad on
the bottom of the leveling foot. Turn the wrench
clockwise to extend the leveling foot until it makes firm
contact with the floor.
3. Repeat step 2 for each of the remaining leveling feet.
4. Use a level to determine which feet need further
adjustment to level the frame. Adjust as necessary.