NetShelter VX Four-Post Open Frame—User’s Manual
Contents
Product Overview . . . . . . . . . . . . . . . . . . . . . . . . . 1
NetShelter VX Four-Post Open Frame models 1
Product Inventory . . . . . . . . . . . . . . . . . . . . . . . . . 2
Features of the Four-Post Open Frame 3
Hardware, grommets, and covers 4
Before Installation. . . . . . . . . . . . . . . . . . . . . . . . . 5
Location of mounting hardware 5
Tools required 5
Packaging of the frame 6
Unpacking the frame 7
Disclaimer 7
Taking inventory 8
Configuration 8
Installing the Four-Post Open Frame . . . . . . . . . . . 9
Leveling feet 9
How to level the frame 9
Removing the casters and leveling feet (optional) 10
Stabilizing kits (optional) 10
Installing Equipment . . . . . . . . . . . . . . . . . . . . . . 12
Identifying one U-space on the mounting rail 12
Installing and removing caged nuts 13
Grounding studs 14
Cable Management . . . . . . . . . . . . . . . . . . . . . . . 15
Location of cable access openings 15
Removing the skirts 16
Cable management options 16
Vertical Mounting Rails . . . . . . . . . . . . . . . . . . . . 17
Location of screws for adjusting the mounting rail 17
Adjusting the mounting rails on the frame posts 18
Repositioning the rails using the horizontal braces 18
NS UM 990-0398.book Page i Tuesday, February 12, 2002 10:26 AM
Comments to this Manuals