APC SX 24U Cabinet Specifications Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
7 NetShelter SX 24U Cabinet - Installation and Customization Manual
Level the Equipment
NOTE: The leveling feet at the corners of the equipment provide a stable base if the floor is uneven, but they
cannot compensate for a badly sloped surface.
1. Ensure the cabinet is in its intended location. Remove the front and rear doors.
See “Removal” on page 9 for instruction.
NOTE: Before removing the front door, unplug the ground wires and any other wire connections that
may interfere with the removal of the doors.
2. Insert a Phillips head screwdriver into the screw above the leveling foot. Turn the screw clockwise to
extend the leveling foot until it makes firm contact with the floor.
3. Adjust each foot and, using a level, adjust the feet until the cabinet is level and plumb.
4. Install the front and rear doors.
Remove the Casters and Leveling Feet (optional)
1. Lay the cabinet on its side.
2. Using a 10 mm socket wrench (not provided), remove the four hex nuts from each of the casters and
remove the casters.
3. For each leveling foot, use a Phillips screwdriver to turn the foot clockwise until it is released from the
frame.
NOTE: Remove all equipment from the cabinet before removing casters and leveling feet.
DANGER
HAZARD OF ELECTRIC SHOCK
When Installing the doors, remember to reconnect all ground and other connection wires.
Failure to follow these instructions will result in death or serious injury.
ns2304a
NOTES:
1. If loaded with equipment, a
13 mm open ended wrench
can also be used to lower the
leveling feet.
2. This method works best with an empty, or near empty
cabinet.
3. Door removal is not required if using the 13 mm open-ended wrench.
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 27 28

Comments to this Manuals

No comments