Page view 10
D
ANGER
H
AZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC
FLASH
· Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA 70E.
· This equipment must only be installed and serviced by qualified
electrical personnel.
· Turn off all power supplying this equipment before working on or
inside equipment.
· Always use a properly rated voltage sensing device to confirm
power is off.
· Replace all devices, doors and covers before turning on power to this
equipment.
Failure to follow these instructions will result in death or
serious injury.
The recommended conduit entry is at the bottom of the device enclosure.
Use a conduit seal that is appropriate for the enclosure rating.
The communication patch cables are marked with matching phase
connections. If any of the cables are removed, reconnect the cables as
marked.
Remove screws from the bottom of the enclosure to create drain holes.
CONDUIT LOCATION AND
RECOMMENDATIONS
INSTALLATION
SPECIAL ENCLOSURE
CONSIDERATIONS
Removing and Reconnecting
the Communication
Patch Cables
NEMA 3R Applications
INSTALLATION
APC MODULAR PANEL PRODUCTS Surge Protective Device (SPD)
Mounting Recommendation
Locate the SPD as close as physically possible to the node/equipment to
be protected, thereby limiting lead length and ensuring lower let through
voltages on the protected equipment. For every foot of wire length,
approximately 1 nanosecond of turn-on/turn-off time will be added, and
approximately 175 volts (6kV/3kA,8/20 microseconds) will be added to the
clamping voltage.
11