Symmetra® PX 10-80 kW 208 V Site Preparation Guide - 990-1425A 8
Site Preparation Checklist
System Components. Have you –
The UPS houses up to 9 power modules (up to 80 kW, N+1). Have you -
Each Battery Enclosure houses up to 8 Battery Modules (32 battery units). Have you –
Site Preparation. Have you –
Arrival Preparation. Have you –
5 verified that UPS output power meets current and future load (kW) requirements?
5 added N+1 redundancy with an additional Power Module (Part # SYPM10KF).
5 determined minimum battery run time requirement based on load (kW) and selected the
proper number of Battery Enclosures (SYCF8BF) and Battery Modules (SYBT4)?
5 added N+1 redundancy with an additional Power Module (Part # SYPM10KF).
5 considered Management Card accessories to meet monitoring requirements?
5 considered Service Program or Extended Warranty plan?
5 verified that rated input voltage and current are available? (see System Electrical
Information).
5 considered correct operating space, floor strength (Section on System Components),
cooling, and environment (Section on Operating Environment).
5 reviewed all electrical requirements to determine wiring requirements?
5 verified that space and handling equipment are available to receive the UPS? (including
unloading the UPS from the delivery truck).
5 scheduled an electrician to install the UPS?