Installation: Communication Connection
10 InfraStruXure Manager
Apply power to the InfraStruXure Manager and switch (or hub)
After you install the InfraStruXure Manager and switch (or hub) and make all of the communication
connections, connect the power cords to a Rack PDU within the enclosure to apply power to the
InfraStruXure Manager.
Remove power from the InfraStruXure Manager and switch (or hub)
If you need to remove power from the InfraStruXure Manager and switch (or hub), you must first
shut down the manager from the client interface:
1. From the System Management menu, select Server and then Shutdown or Reboot Server....
2. In the Shutdown or Reboot Server window, select Shut Down Server, and click OK.
3. After the HDD LED has been inactive for 30 seconds, unplug the InfraStruXure Manager and
switch (or hub) from the Rack PDU.