8 NetworkAir RM Air Distribution Unit
Installation
Installing the
duct assembly
1. With the slotted holes positioned to the rear of the
enclosure, place the duct and bellows assembly onto the
guide and rail assemblies. Slide the assembly forward as
far as it will go.
2. Locate the holes in the bottom of each rail flange that
align with the center of the duct and bellows assembly
slots. Using the caged nut tool, install a caged nut in each
of these holes.
N
ote
For non-raised floor applications you must
remove the bellows for proper operation. Pull
apart the hook-and-loop tape holding the bellow
to the duct.