APC ACF002 Datasheet Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
10 NetworkAir RM Air Distribution Unit
Installation
Cutting the
opening in the
raised-floor
tile(s) (raised
floor
applications
only)
1. Using the inside edge of the duct opening as a template,
mark the location for the opening to be created in the
raised floor tile.
2. Move the enclosure to provide access to the floor tile(s)
for cutting.
0
3. Remove the floor tile(s) and cut an opening in the tile(s)
at the location marked. Use tools that will provide a
clean, accurate cut.
4. Using the supplied alcohol swab, clean the edges of the
opening in the floor tile.
5. Remove the hook halves of the hook-and-loop tape from
the bottom lip of the fabric portion of the duct. Remove
the protective plastic covering the adhesive. Place the
tape along the perimeter of the opening, adhesive-side
down.
6. Reinstall the floor tile in its original position.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 27 28

Comments to this Manuals

No comments