v. Grid Interconnection: Provide an MCHP unit that meets or exceeds the performance requirements
outlined in UL 1741.
c. Power Management
i. System shall optimize power output with power management equipment.
ii. Con guration of power management equipment shall allow for pre-selected loads to have
delayable, non-delayable, interruptible and non-interruptible settings.
1.E.9 1.04 SUBMITTALS
E. General: Submit listed submittals in accordance with Conditions of the Contract and Section [01 33 00 –
Submittal Procedures]
F. Product Data: Submit product data, including manufacturer’s technical speci cation sheets and User Guides.
G. Load Calculation: Submit a residential load calculation performed by ACCA’s Manual J7.
H. Shop Drawings: Submit installation manuals for system components.
1.E.10 1.05 QUALITY ASSURANCE
C. Regulatory Requirements:
a. Furnace: Certi ed to ANSI Z21.47/CSA 2.3 latest Revision: American National Standard/CSA Standard
for Gas-Fired Central Furnaces
d. MCHP Unit: Certi ed to UL 2200 Standard for Stationary Engine Generator Assemblies and UL 1741
Standard for Inverters, Converters, Controllers and Interconnection System Equipment for Use with
Distributed Energy Resources
b. All system components must be approved for installation in the State of Massachusetts by the State
Plumbing Board.
D. Manufacturer Quali cations:
a. Minimum of 5 years experience in the design and manufacture of fully integrated micro-combined heat
and power systems.
1.E.11 1.06 DELIVERY, STORAGE & HANDLING
D. General: Comply with Division 01 Product Requirements Section
E. Delivery: Deliver equipment in manufacturer’s original, unopened, undamaged containers with identi cation
labels and installation/owner manuals intact.
F. Storage and Protection: Store equipment protected from exposure to harmful environmental conditions.
1.E.12 1.07 WARRANTY
C. Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
D. Manufacturer’s Warranty: Submit in accordance with Section [01 78 36 – Warranties] for Owner’s acceptance
manufacturer’s standard warranty document executed by authorized company of cial. Manufacturer’s warranty is
in addition to, and not a limitation of, other rights Owner may have under Contract Documents.