APC AR204A User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
NetShelter Four-Post Rack—Installation8
Join the Four-Post Racks
Join the racks directly with no spacing between them using the available holes on the vertical frame posts
and the provided hardware.
Join the racks together using the 6-in Spacer Brackets (AR8652) when installing the optional cable
management accessories 6-in and 12-in Vertical Cable Managers (AR8650 and AR8651).
Mount an APC Rack Power Distribution Unit (Rack PDU)
APC Rack PDUs can be added to your installation with the optional 6-in Spacer Bracket (AR8652).
ns1366a
AR8652
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 23 24

Comments to this Manuals

No comments