APC AR204A User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
9NetShelter Four-Post Rack—Installation
Install Equipment
This section provides information on how to install rack-mount equipment in the NetShelter Four-Post
Rack. The instructions provided with the equipment contain more detailed information.
Identify one U-space on the vertical mounting flange
When installing equipment, locate the top and bottom of a U-space on the mounting flanges. Every third
hole on the mounting flanges of a NetShelter rack is numbered to indicate the middle of a U-space. A U-
space consists of one of these numbered holes and one hole directly above and below it, as shown.
Install cage nuts
APC offers a cage nut hardware kit (AR8100) for use with square holes.
Warning: Install cage nuts horizontally, with the ears engaging the sides of the square
hole. Do NOT install cage nuts vertically with the ears engaging the top and bottom of
the square hole.
1. Insert the cage nut into the square hole by hooking
one ear of the cage nut assembly through the far side
of the hole.
Note: Install the cage nuts on the interior
of the vertical mounting flange.
2. Place the cage nut tool (provided) on the other side
of the cage nut and pull to snap it into position.
Remove cage nuts
1. Remove any attached screw.
2. Grasp the cage nut and squeeze the sides to release it from the square hole.
1 U
7
6
5
ns0014a
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 23 24

Comments to this Manuals

No comments