APC AR2316BLK Datasheet Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
4 NetShelter VX Enclosure: Unpacking, Installation, Customization
Before Installation
Location of keys and mounting hardware
The keys are inside the enclosure, fastened to the front left, vertical, side-
facing mounting rail. The bag containing the mounting hardware is fastened
to the floor of the enclosure.
Tools provided
Tools required
Warning
Read all instructions thoroughly. Warning symbols indicate important
instructions that must be followed to prevent injury or damage.
Use at least two people to unpack and assemble the enclosure.
To prevent the enclosure from tipping over, stabilize the enclosure before
installing the components.
Do not extend more than one component from the enclosure at one time.
Load the heaviest components first, and place them toward the bottom of
the enclosure to prevent the enclosure from becoming top-heavy.
Hex key Caged nut tool Leveling and
unpacking wrench
Phillips screwdriver Utility knife Level
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 41 42

Comments to this Manuals

No comments