Page view 11
NetShelter SX Enclosure: Unpacking, Installation, and Customization8
Installation
Installing the Enclosure
Warning: For extra stability, load 158 kg (350 lbs) of equipment into the bottom of the
enclosure before moving it on its casters.
Leveling the enclosure
Level the enclosure before installing equipment.
The leveling feet at the corners provide a stable base if the floor is uneven, but they cannot compensate
for a badly sloped surface. You can remove the casters and leveling feet to allow the base of the
enclosure to rest directly on the floor.
1. Move the enclosure to a level location.
2. For each leveling foot, insert a Phillips or
slotted screwdriver (not provided) into the
screw above the leveling foot. Turn the
screw clockwise to extend the leveling
foot until it makes firm contact with the
floor.
Note: If the enclosure needs to be leveled after equipment has been installed, use a 13-mm
open-ended wrench (not provided) to lower the leveling feet. For each leveling foot, fit the
13-mm end of the open-ended wrench (not provided) to the hex head just above the round pad
on the bottom of the foot. Turn the wrench clockwise to extend the leveling foot until it makes
firm contact with the floor.