NetShelter SX Enclosure: Unpacking, Installation, and Customization24
Equipment with side airflow requirements
For enclosures storing equipment that requires side airflow, the vertical mounting flange
factory-installed cable cutout covers need to be removed and repositioned to the rear of the enclosure.
1. Determine which side of the enclosure is the air intake side for the equipment.
2. Remove the cable cutout
covers from the front vertical
mounting flange of the air
intake side of the enclosure.
3. Reinstall the covers in the
cable cutout holes on the rear
vertical mounting flange of the air
intake side of the enclosure.