34020846EN/AD - Page 42
1. Installation
SSC maintenance cabinet
800 and 1200 kVA
Remove the protective covers
This operation may only be carried out by authorized staff.
The door must be opened using the Ronis 405 key.
l Key:
(1) Front face protective covers
(2) Roof protective cover
(3) Earth bar
(4) To Earth
(5) To the load
(6) To the SSC
(7) To the UPS
1 - Remove protective covers (1) and/
or (2).
Connect the cables
This operation may only be carried out by authorized staff.
See “Characteristics of the connection terminals”, page 21.
1 -Check switches Q3B ext (1) and
Q5N ext (2) are in the OFF position as
shown opposite.
2 - Connect the protective conductor
(PE or PEN) to the earth bar
3 - Connect the UPS conductors in the
following order: L1, L2, L3
4 - Connect the AC Bypass
conductors in the following order: L1,
L2, L3
5 - Connect the load conductors in the
following order: L1, L2, L3
6 - Refit the protective covers
A
A
3
5
7
7
6
6
1
1
1
1
1
2 2
1
4
5
OFF
OFF
1
6
7
Top entry
Bottom entry
Right side view
Front view
Front
Top view
view
.
N L1 L2 L3
N L1 L2 L3
N L1 L2 L3
559
807
1270
Q3BP
ext
Q5N
ext
OFF
OFF
Load NS UPSEarth