990-4050
Installation Guide APC Silcon 10-40kW 400V UPS 3
Contents
1.0 Introduction 5
1.1 Tools and Equipment 5
2.0 Unpacking 6
3.0 Installation 8
3.1 Requirements on Site 8
3.1.1 Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table: 8
3.2 Footprint 10
3.2.1 600mm UPS Cabinet with 1xBP I or Isolation Transformer 10
3.2.2 800mm UPS Cabinet with 1xBP I or Built-in Isolation Transformer, or 2xBP I 10
3.2.3 1000mm Cabinet for 10-20kW UPS with 3xBP I 11
3.2.4 600mm Cabinet for 40kW UPS without Batteries 11
3.2.5 1000mm Cabinet for 40kW UPS with 2xBP I 12
4.0 External Connection 13
4.1 Connecting the UPS 13
4.1.1 Connecting the 10-20kW UPS 13
4.1.2 Connecting the 40kW UPS 15
4.2 System Integration Interface 17
4.2.1 Connections 18
4.3 Parallel Board 19
4.4 Communication Interface Board 22
4.4.1 Connections 22
4.5 Connecting of APC Silcon Tripel Chassis 23
4.6 APC Silcon Triple Chassis 24
4.6.1 Safety Warnings 24
4.6.2 Product Description 24
4.6.3 Installing Management Peripherals 25
4.6.4 Powering the APC Silcon Triple Chassis 27
4.6.5 Troubleshooting 28
4.6.6 Product Specifications 29
4.7 APC Silcon Battery Cabinets 32
4.7.1 Cabinets 33
4.7.2 Preparing Batteries 33
4.7.3 Mounting Batteries 35
4.7.4 Final Checks 37
4.7.5 APC Silcon Battery Cabinets 38
4.8 Battery Breaker Box/Fuse-box 40
4.8.1 Battery Breaker Box 41
4.8.2 Battery Breaker Box Connection Diagram 42
4.8.3 Fuse-box 43
4.8.4 Fuse-box Connection Diagram 44
4.8.5 UPS with External Battery in Battery Breaker Box/Fuse-box Configuration 45
5.0 Programming Parameters 46
5.1 Parameters 46
5.1.1 Programming Keys 47
5.1.2 Programming Example - Switch to Bypass Operation 48
5.2 System Configuration 48
5.2.1 Programming Example - Change Charge Voltage to 446 50
5.2.2 Programming Example - Change to Output Isolation Transformer available 51
5.3 Programming Parameters for Advanced Parallel Operation 52
5.3.1 Description of Settings 52
5.3.2 Programming example 53
5.4 Battery Monitor 53
5.4.1 Installation of new batteries 53
6.0 Options/Accessories 54
6.1 Service Bypass Panel for Single Operation 54
6.1.1 Wiring up UPS with SBP in TN-C-S Network 56
6.1.2 Wiring up UPS with SBP in TN-S Network 56