APC AIS 3000 Installation Manual Page 42

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 41
34 AIS® 3000 10-40kVA, 400V, Site Preparation and Installation Manual – 990-2258
Wiring
Make sure the UPS is in its location of use before wiring begins.
CAUTION!
Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection (N) is
present.
Power terminal lug diameter: minimum 6mm.
Torque value: 5Nm
If floor anchoring is required, attach the Floor Anchoring Brackets to the UPS now.
Follow step 1 under Floor Anchoring (Option).
Please leave a copy of your wiring diagram with the customer to facilitate maintenance
and troubleshooting.
Page view 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 59 60

Comments to this Manuals

No comments