APC S15 Operations Instructions Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
2-2
Removing the Battery Pack
1. Remove the battery retaining bar.
2. Pull the battery straight back.
3. Push in the retaining tabs to allow the battery to come out completely.
Placing the Unit
Proper placement of the S10 or S15 should be accomplished in accordance with the
following:
Caution: The S10 and S15 weigh approximately 60 pounds each. Two-person lift is
recommended. Lift each unit carefully by firmly grasping both sides of unit in the
middle. Failure to comply may result in personal injury and/or equipment damage.
Place unit on a solid, flat surface that is capable of supporting at least 60 lbs.
Note: Avoid placing other components directly on top of or behind the unit.
Leave at least one inch of space on all sides to allow for proper air
ventilation. Do not block the fan.
If the S Type unit is to be rack-mounted, please follow these 4 basic steps:
Note: The included rack-mounting hardware is designed for 19” wide racks
only.
1. Install the rack-mount rails. (See the installation sheet located in the box containing
the rack-mount rails.)
2. Install the rail cleats. (See the installation sheet located with the cleats in the box
marked “Accessories.”)
3. Install rack-mount ears. (OPTIONAL — See the installation sheet located with the
cleats in the box marked “Accessories.”)
Note: Rack-mount ears are required only if you desire to lock the unit to the
front of the rack to prevent movement from front to rear.
Caution: Rack-mount ears should NEVER be used alone to support the unit.
Rack-mount rails should always be used to support the unit’s weight when
rack-mounting.
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 59 60

Comments to this Manuals

No comments