Shipping, Receiving, and Unloading
10 Smart-UPS
®
VT Maintenance Bypass Panel w Power Distribution, 10-30kVA, 208V - 990-4199B
4. Attach the wooden ramp to the side of the pallet that contains a velcro strip. The top of the ramp
also contains velcro strips on its underside. Securely mate the two (2) sets of velcro strips.
5. Carefully roll the MBP off its pallet and down the ramp. The unit should be brought to rest on a
smooth and level surface.
Caution
At least two (2) people should be involved in unloading the MBP from its pallet.
Velcro Strip
Velcro Strips
(underside of
Ramp)
(on Pallet)
Comments to this Manuals