Installation
26 Smart-UPS
®
VT Maintenance Bypass Panel w Power Distribution, 10-30kVA, 208V - 990-4199B
Rear panel re-attachment.
1. Re-connect the internal ground cable to the panel’s ground stud. Secure the ground cable lug to
the stud with an M6 flange nut. Use an M10 nut driver and torque to 120in-lbs [14Nm].
2. Holding the panel at an angle away from the enclosure, lower the panel’s two (2) base tabs into
the two (2) slots at the bottom of that section of the enclosure (middle or bottom).
3. Push the top of the panel forward until it is properly set in position.
4. Use a T30 Torx screwdriver to tighten the two (2) M6 Torx screws under the top lip of the panel.
Note
The TOP and BOTTOM rear panels are re-attached in exactly the same way. Use
the following procedure to re-attach each of the rear panels in its turn.
The instructions for re-attaching the rear panels are the reverse of the instructions
for removing rear panels. Refer to the graphic on page 15.
Note
After installation, the TOP rear panel MUST be removed whenever the ground and
neutral bars at the back of the panel board (if included) need to be accessed.