3Pumped Refrigerant System Operation and Maintenance
Commissioning
After installation, verify that all components are working properly and that the equipment is ready to
begin operation.
Inspection Checklists
Initial Inspection Checklist
The initial inspection ensures that the equipment has been properly installed, the location of the
equipment has been properly prepared and the equipment is free of damage.
Note: Although it is not necessary for the RDU to be installed in a room with a vapor barrier,
the computer room should have one as a vapor barrier minimizes moisture infiltration.
Without a vapor barrier, it will be difficult to maintain the humidity in the room. Do not
introduce unconditioned outside air into the computer room.
Note: A minimum of 900 mm (36 in) of clear floor space in front of the RDU is required for
service access.
5
Ensure the installation procedure is complete according to the installation manual.
5
If the RDU is installed in the computer room, ensure that the walls, floor, and ceiling of the room where the
equipment is located are sealed with a vapor barrier.
5
Ensure there is no evidence of damage to the equipment.
5
Ensure the equipment is level.
5
Ensure that the equipment is joined to the adjacent racks if it is installed at the end of a row.
5
Ensure the clearance around the equipment is in accordance with local and national codes and regulations as
well as the installation manual.