5InRow RC Operation and Maintenance
Start-up Inspection
The start-up inspection ensures that the equipment is operating properly after the initial start-up. This
inspection verifies that all modes of operation are working correctly and that the cooling unit is ready for
normal operation.
Final Inspection
The final inspection verifies that the system is clean, and the start-up form has been sent to APC.
While the equipment is operating, ensure that:
R
The cooling unit is free from malfunctions, including chilled water leaks, unusual vibrations, or other
irregularities, in each mode of operation.
R
The current draw of fan motors and transformers for the cooling operation is within the ratings of the
respective circuit breakers.
R
Feed B can supply power to all functions in the equipment.
R
The cool cycle engages.
R
The correct water outlet temperature sensor is positioned in connector J23.
R
Air filters are clean and free of debris. Replace air filters with APC air filters only. (APC part number
W875-201)
R
The clogged filter alarm is operating properly.
Cover 1/3 of the filter area to initiate the alarm.
Ensure that:
R
The system is clean and free from debris.
R
Packaging materials are disposed of properly.
R
The start-up form was completed and sent to APC.