44 Smart-UPS
®
VT 10-40kVA, 400V, Site Preparation and Installation Manual 990-1986
Battery securing
Attach two Seismic Battery Brackets per Battery Module in such a way that one bracket secures two
Battery Units.
Insert the two tabs of the Seismic Battery Bracket into the slots of the two Battery Units.
Push the Seismic Battery Bracket to the right and push it downwards. Align the Seismic Battery
Bracket hole with the hole in the battery shelf.
Use one M6 screw to fasten the Seismic Battery Bracket to the shelf.
Use same procedure to secure all batteries in the Enclosure.
Front Panel
Note
Seismic anchoring procedures identical for both 14in/351mm and 20in/523 mm UPS
Enclosures.