Options/Accessories
990-4051
Installation Guide APC Silcon 60-80kW 400V UPS 57
6.2.5 Switching Back to Normal Parallel/Redundant Operation
1. Turn input switch (Q001) and output switch (Q002) to position “1”
2. Charge capacitor, connect battery and start up UPS
UPS will automatically switch to normal operation and start load-sharing with other
parallelled UPS(s).
WARNING!
System will discharge built-in capacitors, but check terminal voltage before proceding.
H002a
Comments to this Manuals