The following sections describe the status and informational screens.
Status Screens
The most important status screens available after the Selftest has completed consist
of:
INPUT VOLTAGE: XXXV; OUTPUT VOLTAGE: XXXV
SYSTEM LOAD: <XXXW; LOAD: <XXX%
EST. RUNTIME: XHRS; FUEL: XXX%
INPUT VOLTAGE: XXXV; OUTPUT VOLTAGE: XXXV
This screen (Figure 14) shows the actual input utility voltage level, as well as the
actual voltage level being output to the connected devices.
Note: As shown in Figure 14, at times, the voltage values on this screen may not
match. This may be due to the fact that separate circuits are used to make
these voltage measurements, and there is a time delay between the two
circuits for updating this status screen. This condition is considered part
of the normal operation of the unit. Also, the voltage values may not
match if the AVR is active.