APC Smart-UPS VT Installation Manual Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
Site Preparation – Operating Environment
990-2283 Smart-UPS® VT 10-40kVA 400V Site Preparation and Installation Manual 21
EPO switch wiring
The UPS must be connected to either a dry contact or a 24VDC Emergency Power Off (EPO) switch or
according to national rules.
WARNING!
At 100% non-linear load (EN50091-3 standard), the neutral shall be rated for 200% phase
current.
See “Communication Wiring to EPO and Optional Equipment” on page 37 in this
manual.
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 59 60

Comments to this Manuals

No comments