Electrical Installation – Communication Wiring to EPO and Optional
990-2283 Smart-UPS® VT 10-40kVA 400V Site Preparation and Installation Manual 41
Remove the 2 screws from the cable inlet at the front – and remove cable-inlet plate.
Guide the cable through the hole in the bottom plate and up through the cable inlet.
Guide the cable up alongside the side panel and insert the Humidity Sensor plug into the socket
marked “Probe”.
Fasten the cable to the side panel with the enclosed cable ties
Remount the cable-inlet plate.
Place the Humidity Sensor where applicable.
See “Foot print” on page 6 for locating the bottom cable inlet.
10/100Base-T
Probe
AP9619 Network Management Card EM
!
Reset
Output
Pwr
Zone
10/100