APC AP9224 Datasheet Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
18 MasterSwitch VM: Installation and Quick Start Manual
Connecting MasterSwitch VM
Setting up
multiple units
To set up multiple units in a cascading configuration:
1. Plug each MasterSwitch VM unit into a protected power
source.
2. Connect the 10Base-T network port located on the rear
panel of the controller to the network, using an
appropriate cable.
3. Connect the MasterSwitch VM units.
a. Insert one end of a communication cable (APC part
number 607-0035A) into the RJ-11 port labeled Out
on the last unit (unit in the following figure).
b. Insert the other end of the communication cable into
the RJ-11 port labeled In on the next unit (unit in
the following figure).
c. Connect unit to unit and unit to unit in the
same manner.
In
Out
In
Out
In
Out
In
Out
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 31 32

Comments to this Manuals

No comments